Beckley Coal Company v. Secretary of Labor (MSHA) (Commission decision, November 15, 1979)

Beckley Coal Company (FMSHRC HOPE 77-92): Methane-test violation and $300 penalty affirmed

Decision type
Commission decision
Dockets
HOPE 77-92, IBMA 77-52
Decided
November 15, 1979
Outcome
Citations affirmed
Precedential status
Citable Commission precedent
Checked against source
2026-10-23
Cited standards

Apply this precedent to your situation

This is citable Commission precedent from 1979, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 1979
The MSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Decision of the Commission
The Commission affirmed the judge's finding of a methane-testing violation and the $300 penalty. This is a final Commission decision, citable as Commission precedent. It may have been appealed to a U.S. Court of Appeals under 30 U.S.C. § 816; check subsequent history before relying on it. The full text below is from the official FMSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official FMSHRC release. The full text is the agency's own release.
Read the official release (fmshrc.gov)

Plain-English summary

A roof bolting machine entered a working place at Beckley Coal Company's mine after a foreman had tested for methane, but the Commission agreed with the judge that the test was not made immediately before the machine's entry as required. Beckley argued that an inspector's own test satisfied the rule and that the violation notice lacked detail. The Commission rejected both arguments: the duty to test belonged to the operator, and the notice adequately identified the alleged violation. It affirmed the judge's decision and left the $300 penalty in place.

Decision snapshot

  • Cited standard: 30 C.F.R. § 75.307-1, requiring a methane examination immediately before electrical equipment enters a working place.
  • Outcome: Violation affirmed; $300 penalty left in place.
  • Key point: The inspector's methane test did not replace the operator's duty to conduct its own timely test.

Full text (FMSHRC public release)

CCASE:
BECKLEY COAL V. MSHA
DDATE:
19791115
TTEXT:

FEDERAL MINE SAFETY & HEALTH REVIEW COMMISSION WASHINGTON, D.C.
November 15, 1979

BECKLEY COAL COMPANY

v. Docket No. HOPE 77-92
IBMA No. 77-52
SECRETARY OF LABOR,
MINE SAFETY AND HEALTH
ADMINISTRATION (MSHA)

DECISION

This appeal was pending before the Interior Department Board of Mine Operations Appeals as of March 8, 1978. Accordingly, it is before the Commission for decision. 30 U.S.C.A. $961 (1979). The administrative law judge found a violation of 30 CFR 75.307-1 which requires in pertinent part that an examination for methane be made at the face of each working place "immediately prior" to the entry of electrical equipment into the working place. He assessed a penalty of $300. We affirm the judge's decision.

On February 4, 1976, a MESA inspector issued a notice of violation of 30 CFR $75.307-1. He had observed a roof bolting machine move into a working place, and had not seen anyone conduct a methane test prior to the machine's entry. The inspector made a methane examination at the face about five minutes before the roof bolting machine was moved into the working place. The section foreman also made a methane examination at the face before telling the roof bolter operator to proceed to the working place. The parties disputed the exact time of the section foreman's test.

Beckley argues that the MESA inspector's methane examination fulfilled the requirement of the regulation. We disagree. The statute imposes a duty upon the operator to comply. 1/

Beckley also argues that the foreman's examination was made "immediately prior" to moving the roof bolter into the working place. The judge disagreed and found that it "was made at some point in time prior to the immediate movement of the roof bolter inby the crosscut, that is, prior to the time that it took the roof bolter to move out of the [old] working place and into the [new] working face", and therefore did not meet the "immediately prior" requirement of the regulation. J.D. at 23. As the judge held, "I find that lapse of time and the time interval does not meet the 'immediately' test of the regulation and constitutes a violation." Id. We agree.
________
1/ 30 U.S.C. $801(g)(2)(1976)(amended U.S.C.A. 1979). See also 30 U.S.C. $817(c)(amended U.S.C.A. 1979).

~1795
Finally, Beckley argues that the notice of violation does not adequately describe a violation, and that consequently it was prejudiced in preparing its defense. We also reject this argument. The notice contained the standard allegedly violated along with a written description of the condition leading to its issuance. 2/ In light of this Beckley was fully apprised of the allegations against it.

Accordingly, the judge's decision is affirmed.
___
2/ The notice of violation stated in relevant part:

James Richardson, roof bolter operator, supervised by Tom Cochran was observed tramming the roof bolting machine into the no. 47 crosscut ... before making an examination for methane ...

Does this precedent still control your case?

Ezel checks whether it still stands, including any court review since, and applies it to your situation with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace