Plain-English summary
Five Star Automatic Fire Protection classified three workers installing a fire protection system at Holloman Air Force Base as general laborers. The Board upheld the finding that their work required pipefitter wages under the applicable wage determination and local collective bargaining agreement. It affirmed $71,285.49 in back wages. The Board vacated the separate three-year debarment order because the ALJ had not adequately explained the finding of gross negligence or willful blindness. It required the ALJ to resolve conflicting testimony about employee classifications and warnings over pay complaints, and to explain the relevance of the company’s Davis-Bacon experience. Debarment remained for further consideration on remand.
Decision snapshot
- Cited authorities: 40 U.S.C. § 3142; 40 U.S.C. § 3701; 29 C.F.R. § 7.1(e); 29 C.F.R. § 5.12(a); 5 U.S.C. § 557(c)(3)(A)
- Outcome: Misclassification finding and $71,285.49 back wages affirmed; three-year debarment vacated and remanded.
- Key point: A prevailing-wage violation does not by itself establish grounds for debarment; the ALJ must explain the required greater culpability and resolve material evidentiary conflicts.
Full text (DOL official public release)
U.S. Department of Labor Administrative Review Board
200 Constitution Ave. NW
Washington, DC 20210-0001
IN THE MATTER OF:
ADMINISTRATOR, WAGE AND ARB CASE NO. 2023-0051 HOUR DIVISION, UNITED STATES DEPARTMENT OF LABOR, ALJ CASE NO. 2019-DBA-00004
ALJ PATRICK M. ROSENOW
PROSECUTING PARTY,
DATE: August 25, 2025
v.
FIVE STAR AUTOMATIC FIRE
PROTECTION LLC,
RESPONDENT.
Appearances:
For the Prosecuting Party, Administrator, Wage and Hour Division:
Seema Nanda, Esq., Jennifer S. Brand, Esq., Megan E. Guenther,
Esq., Jonathan T. Rees, Esq., Sarah M. Roberts, Esq.; U.S. Department
of Labor, Office of the Solicitor; Washington, District of Columbia
For the Respondent:
Robert L. Blumenfeld, Esq.; Mendel Blumenfeld & Pulido, PLLC;
El Paso, Texas; Michael T. Milligan, Esq.; Law Office of Mike Milligan;
El Paso, Texas
Before JOHNSON, Chief Administrative Appeals Judge, and KAPLAN, and BURRELL, Administrative Appeals Judges 2
DECISION AND ORDER AFFIRMING IN PART AND VACATING AND
REMANDING IN PART
This matter arises under the Davis-Bacon Act (DBA), 1 the Contract Work
0F
Hours and Safety Standards Act (CWHSSA), 2 and their implementing regulations. 3
1F 2F
Respondent Five Star Automatic Fire Protection worked as a subcontractor installing a fire protection system in the medical clinic at Holloman Air Force Base in Otero County, New Mexico. 4 An Administrative Law Judge (ALJ) found
3F
Respondent misclassified Complainants’ 5 position and failed to pay them prevailing
4F
wages and benefits in violation of the DBA, and that Respondent owed Complainants $71,285.49 in back wages. 6 The ALJ also ordered that Respondent be
5F
debarred from receiving federal contracts for three years. 7 Respondent appealed to
6F
the Administrative Review Board (Board). For the following reasons, we affirm in part and vacate and remand in part.
BACKGROUND
Respondent is a fire sprinkler installation business co-owned by Luis and
Veronica Palacios. 8 Respondent has worked on DBA projects since its inception, and
7F
both Luis and Veronica have relevant experience with the DBA. 9 8F
Respondent has three categories of sprinkler fitting employees based on their
skills and experience. These categories include laborers, who are new hires who are inexperienced and work under supervision, supervisors or journeyman sprinkler fitters, and apprentices. Respondent’s system attempted to assign one laborer to each foreman so that laborers could learn about the work and perform certain tasks that apprentices also perform. 10 Foremen are responsible for teaching laborers. 11
9F 10F
After approximately one year, laborers may become eligible to participate in
1 40 U.S.C. § 3141 et seq.
2 Id. § 3701.
3 29 C.F.R. Parts 1, 3, 5-7.
4 Decision and Order (D. & O.) at 2-4.
5 Complainants are Jesus Torres, Christopher Garcia, and Miguel Garcia. 6 Id. at 18. 7 Id. 8 Id. at 3. 9 Id. 10 Id. at 3-4. 11 Id. at 4. 3
Respondent’s apprenticeship program. 12 After completing the program, apprentices
11F
become journey sprinkler fitters. 13
12F
On August 19, 2014, the United States Army Corps of Engineers awarded a
prime contract to Gilbane for a replacement medical clinic at Holloman Air Force Base in Otero County, New Mexico. 14 The contract was valued at $51,958,664.00. 15
13F 14F
On December 22, 2014, Gilbrane contracted with Respondent to furnish, install, and complete all fire protection systems with a subcontract that was valued at
$462,746. 16 The subcontract left staffing decisions up to Respondent. 17 Both the
15F 16F
contract and subcontract were subject to the provisions of the DBA. 18 17F
The Wage Determination did not contain a sprinkler fitter job
classification. 19 The closest classification was the pipefitter classification. 20 The
18F 19F
Department of Labor’s (DOL) Wage & Hour Division (WHD) determined that the local union prevailed regarding the pipefitter classification and wage rate, with a prevailing wage rate of $31.14 per hour and $12.42 per hour in fringe benefits. 21 20F
The prevailing wage rate for common laborers listed in the Wage Determination was $13.61 per hour in wages and $3.89 per hour in fringe benefits. 22 21F
From June 5, 2016 to August 13, 2017, Respondent assigned four employees
to work on the project, which included Adrian Cabral, a journeyman sprinkler fitter and foreman who was paid under the pipefitter job classification, and three general laborers: Jesus Torres, Christopher Garcia, and Miguel Garcia. 23 Respondent
22F
employed Jesus from July 2015 to March 2017, Christopher from February 2016 to
12 Id.
13 Id.
14 Id.
15 Id.
16 Id.
17 Id.
18 Id.
19 Id.
20 Id.
21 Id.
22 Id. As discussed later, while the Wage Determination contained a “common laborer” position, this project was under a Collective Bargaining Agreement, which did not include a “common laborer” position. Id. at 4, 8-10, 16. 23 Id. at 5. 4
May 2017, and Miguel from November 2015 to May 2017. On May 3, 2017, Respondent enrolled Christopher and Miguel in the apprenticeship program. 24 23F
In October 2017, the WHD began investigating Respondent for the period of
June 5, 2016 to August 13, 2017. 25 On August 1, 2018, the WHD issued a Notice of
24F
Determination finding that Respondent misclassified the work that Torres and the Garcias performed and ordered Respondent to pay $71,285.49 in back wages and be debarred. 26 25F
Respondent objected and requested a hearing before an Administrative Law
Judge (ALJ) with the Office of Administrative Law Judges (OALJ). 27 A hearing was
26F
held across the following dates: February 23-25, 2021; April 14-16, 2021; and April 30, 2021. 28 Eleven witnesses testified, and the ALJ admitted Joint Exhibits (JX) 1-
27F
74 and 76-79. 29 At the hearing, Respondent moved to admit a final as-built drawing
28F
that Respondent contended reflected any changes made to the original construction design. 30 The ALJ designated the document as JX-80 and stated that he was not
29F
going to rule on whether it was admitted or not until WHD reviewed it. 31 30F
On August 4, 2023, the ALJ issued a D. & O. finding that Respondent
misclassified Complainants’ positions and failed to pay them prevailing wages and benefits in violation of the DBA. 32 The ALJ opined that his findings were based on
31F
the testimony of the eleven witnesses and JX 1-74 and 76-79. 3332F
The ALJ found that Complainants regularly unloaded pipes and other
materials from trucks and placed them in staging areas, moved pipes and other materials from the first staging area and repositioned them to a different one, and moved the pipes and the materials into the needed locations; screwed escutcheons into the ceiling holes pre-cut by others; used caulking guns to seal spaces where they existed; held pipes while Cabral installed, hung, or re-cut or re-grooved them; helped prepare and install hangers by climbing a ladder and securing a metal bar
24 Id.
25 Id. at 2.
26 Id.
27 Id.
28 Id.
29 Id.
30 Transcript (Tr.) at 1399-1403.
31 Id. at 1403-04.
32 D. & O. at 18.
33 Id. at 2. The ALJ did not address whether JX-80 was admitted. 5
with a screw, then placing a hanger on a beam and tightening a bolt; installed brackets and secured sprinkler heads by hand and snapped together flex heads; walked and looked for water dripping during pressure testing; and spent 15-20 minutes at the end of each day sweeping and cleaning up. 34 The ALJ further found
33F
that, on occasion, Complainants worked for extended periods without Cabral’s direct oversight and in a different area of the project; hung lines; pressure tested pipes; and cut, grooved, and threaded pipes. 35 34F
Respondent had contended that some of these tasks were simple and did not
require specialized talent, knowledge, or training, and thus fell under the general laborer category. 36 However, the ALJ determined that “virtually all of
35F
Complainants’ work fell into the pipefitter category” and that the collective bargaining agreement (CBA) and Wage Determination provided notice that workers who performed these tasks must be paid at the pipefitter rate. 37 Thus, the ALJ
36F
concluded that Respondent misclassified Complainants’ positions and ordered Respondent to pay Complainants $71,285.49 in back wages. 38 37F
The ALJ also ordered that Respondent be debarred for three years. 39 The
38F
ALJ found that Respondent demonstrated “at least gross negligence or willful blindness” based on the following factors: (1) Respondent’s preexisting familiarity with the DBA, (2) Complainants’ signing into work with the incorrect classification, and (3) Cabral’s instruction to Complainants to drop their questions about their pay rate. 40
39F
Respondent petitioned the Board to review the D. & O.
JURISDICTION AND STANDARD OF REVIEW
This Board has jurisdiction to hear appeals concerning questions of law or
fact from the Administrator’s final determinations under the DBA and CWHSSA. 41 40F
The Board’s review of the ALJ’s decision “is in the nature of an appellate
34 Id. at 14-15.
35 Id. at 15.
36 Id. at 16.
37 Id.
38 Id. at 18.
39 Id.
40 Id.
41 Secretary’s Order No. 01-2020 (Delegation of Authority and Assignment of Responsibility to the Administrative Review Board (Secretary’s discretionary review of ARB decisions)), 85 Fed. Reg. 13,186 (Mar. 6, 2020). 6
proceeding,” and the Board “will not hear [factual] matters de novo except upon a showing of extraordinary circumstances.” 42 Under this standard of review, the
41F
Board “will assess the ruling to determine whether it is consistent with the applicable statute and regulations, and is a reasonable exercise of the discretion delegated to the Administrator to implement and enforce the DBA.” 43 42F
DISCUSSION
Upon review of the ALJ’s D. & O., the parties’ arguments on appeal, and the
record, the Board concludes that Respondent violated the DBA by misclassifying Complainants’ positions. However, the Board finds that the ALJ did not fulfill his duty of explanation in finding that Respondent acted with gross negligence that would justify a three-year debarment. Accordingly, we affirm the ALJ’s D. & O. in part and vacate and remand in part for the reasons that follow. 44 43F
-
Respondent Violated the DBA
The Davis-Bacon Act requires the payment of locally prevailing wage rates
and fringe benefits to laborers and mechanics working on Federal contracts in excess of $2,000 for the construction, alteration, or repair of public buildings and public works. 45 As the Supreme Court has recognized, the DBA is “a minimum
44F
wage law designed for the benefit of construction workers.” 46 45F
The purpose of the DBA is “to protect local wage standards by preventing contractors from basing their bids on wages lower than those prevailing in the area.” 47
46F
42 29 C.F.R. § 7.1(e); Jamek Eng’g Servs., Inc., ARB No. 2020-0043, ALJ No. 2017-DBA- 00021, slip op. at 7 (ARB June 23, 2021) (quoting Terrebonne Par. Juv. Just. Ctr. Complex, ARB No. 2017-0056, slip op. at 3 (ARB Sept. 4, 2020) (quoting 29 C.F.R. § 7.1(e))). 43 Id. (quoting Interstate Rock Prods., Inc., ARB No. 2015-0025, ALJ No. 2013-DBA- 00010, slip op. at 9 (ARB Sept. 27, 2016)). 44 In addition, Respondent contends that the ALJ admitted JX-80 but failed to address it in the D. & O. Respondent’s (Resp.) Brief (Br.) at 29. Respondent contends that this exhibit demonstrates that Complainants inflated the number of arm-over devices they installed. Id. It is unclear from the record whether the ALJ admitted JX-80. On remand, we instruct the ALJ to determine whether JX-80 was admitted and, if so, correct the record. However, for the reasons that follow, we find that Respondent’s arguments pertaining to JX-80 are not controlling. 45 See 40 U.S.C. § 3142. 46 United States v. Binghamton Constr. Co., 347 U.S. 171, 178 (1954). 47 Dist. Council of Iron Workers of the State of Cal. v. Adm’r, Wage & Hour Div., U.S. Dep’t of Lab., ARB No. 2020-0035, slip op. at 2 (ARB July 26, 2022) (quoting Univs. Rsch. Ass’n, Inc. v. Coutu, 450 U.S. 754, 773 (1981)). 7
To effectuate the statutory objectives of the DBA, the WHD determines the
prevailing wage rates for various job classifications and publishes these rates in documents known as “wage determinations.” 48 To determine the prevailing wage,
47F
the WHD conducts a prevailing wage survey program in the area in which the work is to be performed, and derives DBA prevailing wage rates from survey information voluntarily provided by responding contractors, contractors’ associations, labor organizations, public officials, and other interested parties. 49 The prevailing wage
48F
rates contained in the wage determinations derive from rates prevailing in the geographic area where the work is to be performed or from rates applicable under collective bargaining agreements. 50 Those rates are based on wages paid to the
49F
majority of laborers in corresponding classifications on similar projects in the area. 51
50F
When, as here, an employer is alleged not to have paid employees for the
hours worked, we apply a burden-shifting framework. 52 The WHD bears the initial
51F
burden of proving that employees performed work on the DBA project for which they were improperly compensated. 53 To satisfy its burden, the WHD must:
52F
(1) show that employees performed work for which they were improperly compensated and (2) produce “sufficient evidence to show that the amount and extent of that work as a matter of just and reasonable inference.” 54 Once WHD has
53F
satisfied its burden, the burden shifts to the employer to demonstrate either the precise number of hours worked or to present evidence sufficient to negate “the reasonableness of the inference to be drawn from the [WHD]’s evidence.” 55 54F
To satisfy its burden, the employer must submit evidence that “(1) is based on individualized records[] and (2) fully accounts for the work hours in question, consistent with the project as a whole.” 56 If the employer fails to carry this burden,
55F
48 40 U.S.C. § 3142(b); 29 C.F.R. § 1.3.
49 See 29 C.F.R. §§ 1.1–1.7.
50 40 U.S.C. § 3142(b); 29 C.F.R. § 1.3.
51 Id. at § 1.2(a)(1).
52 Adm’r, Wage & Hour Div., U.S. Dep’t of Lab. v. Coleman Constr. Co., ARB No. 2015- 0002, ALJ No. 2013-DBA-0004, slip op. at 11-13 (ARB June 8, 2016) (citing Anderson v. Mt. Clemens Pottery Co., 328 U.S. 680, 687 (1946)). 53 Id. at 11. 54 Id. 55 Id. 56 Id. 8
employees may be awarded damages, even if the amount of such damages is approximate. 5756F
The ALJ found that Respondent misclassified Complainants’ positions and
that therefore Complainants were not properly compensated for their work. 58 57F
The ALJ determined that there was no real dispute that the Complainants performed the following tasks:
[U]nloaded pipes and other materials and placed them
based on the numbering system as set forth in the
blueprints; screwed escutcheons into the ceiling holes; used
caulking guns to seal spaces; held pipes while Cabral
installed, hung, or re-cut or re-grooved them; climbed
ladders and secured a metal bar with a screw; placed
hangers on a beam and tightened bolts; and installed
brackets and secured sprinkler heads by hand and snapped
together flex heads.[ 59] 58F
The ALJ found that, while some or all of these tasks may be simple and did
not require specialized knowledge or training, “virtually all of Complainants’ work fell into the pipefitter category.” 60 The ALJ also found that the record clearly
59F
demonstrated that the CBA and Wage Determination gave Respondent notice that workers who performed these tasks must be paid at the pipefitter rate. 61 The ALJ
60F
further found that the existence of the “utility worker” category in the CBA, along with the fact that it was highly limited and seldom used, was consistent with the intention of the CBA that workers who performed the tasks Complainants did were to be paid as pipefitters. 62 Thus, the ALJ concluded that Respondent violated the
61F
DBA by misclassifying Complainants. 63 The ALJ found WHD’s calculations of
62F
underpayment to be reasonable and ordered Respondent to pay $71,285.49 in back wages. 64
63F
57 Id.
58 D. & O. at 16.
59 Id.
60 Id.
61 Id. Because the Wage Determination did not contain a “sprinkler fitter” job classification, the ALJ determined that “pipefitter” was the appropriate classification because it was the closest job classification to a sprinkler fitter. Id. at 4. 62 Id. at 16. 63 Id. 64 Id. at 16, 18. 9
Respondent contends that the ALJ erred in finding that the work
Complainants performed fell under the pipefitter classification instead of the general laborer classification. 65 Respondent contends that the ALJ erred in relying
64F
on testimony of business agents, rather than industry experts’ testimony on established construction industry practices. 66 Respondent also contends that the
65F
ALJ’s findings are contrary to the DOL’s definitions of the tasks performed. 67 66F
Respondent asserts that the tasks Complainants performed fall under the “laborer” or “helper” classification, not the “pipefitter” classification. 68 67F
We find that Respondent misclassified the Complainants’ positions.
The purpose of the DBA is to ensure that contractors pay locally accepted wages. 69 68F
The project at issue was covered by a CBA. 70 Although the Wage Determination
69F
included a general laborer position, the CBA did not. 71 Rather, the CBA included
70F
“utility worker” and “pipefitter” classifications. 72 Notably, the “utility worker”
71F
position is limited to a period of six months, may not include employees who are learning a trade, and is limited to only general tasks related to the pipe trade, such as truck driving, picking up and delivering materials, and removing scrap pipe. 73 72F
Utility workers also could not be used to replace apprentices. 74 In contrast, the
73F
CBA’s “pipefitter” classification covers both journeymen and apprentices who perform the following tasks: “unloading, carrying, and organizing pipes and materials; using blueprints or plans; preparing and installing hangers; installing pipe; using a power machine; cutting, grooving pipe, and threading pipe; installing brackets for sprinkler heads and sprinkler heads; hydrostatic testing; caulking; installing escutcheons; and cleaning.” 75 After a thorough review of the record,
74F
we agree with the ALJ that the work the Complainants performed fell into the “pipefitter” classification. As the ALJ found, the Wage Determination did not contain a “sprinkler fitter” job classification and we agree that the “pipefitter” classification is the most similar job classification.
65 Resp. Br. at 33.
66 Id.
67 Id. at 37.
68 Id. at 36.
69 See 40 U.S.C. § 3142.
70 D. & O. at 8.
71 Id.
72 Id.
73 Id. at 9.
74 Id.
75 Id. at 8.
10
Thus, we find that the WHD met its burden by establishing that the
Complainants were misclassified and paid the incorrect wage rate. As such, the burden shifted to Respondent to demonstrate either the precise number of hours worked or to present evidence sufficient to negate “the reasonableness of the inference to be drawn from the [WHD]’s evidence.” 76 Respondent has not challenged
75F
the calculation of back wages. 77 We find that WHD’s calculation is reasonable and
76F
affirm the ALJ’s order that Respondent pay Complainants $71,285.49 in back wages.
-
The ALJ did not fulfill his duty of explanation in finding that
Respondent acted in gross negligence to justify a three-year debarmentContracting with the government is a privilege, not a legal right. In this
matter the government contract requires the contractor to pay employees according to the DBA and CWHSSA, their implementing regulations, and the Wage Determination made by the Secretary of Labor. Whenever a contractor or subcontractor is found to have “disregarded their obligations” to workers or subcontractors under the Wage Determination, such contractor, subcontractor, or responsible officer will be debarred for a period of three years. 78 Once grounds for
77F
debarment have been established, the three-year period is mandatory, “without consideration of mitigating factors or extraordinary circumstances.” 7978F
The recognized purpose underlying the device of debarment is to be a
remedial measure rather than a punitive one “so as to encourage compliance and discourage employers from adopting business practices designed to maximize profits by underpaying employees in violation of the Act.” 80 While effective, the courts have
79F
recognized that debarment can have drastic results for the contractor including a “sudden contraction of bank credit, adverse impact on market price or share of listed stock, if any and critical uneasiness of creditors generally to say nothing of
76 Coleman Constr. Co., ARB No. 2015-0002, slip op. at 11 (quoting Mt. Clemens Pottery, 328 U.S. at 688). 77 See Resp. Br., Resp. Reply Br. 78 29 C.F.R. § 5.12(a). 79 Interstate Rock Prod., Inc., ARB No. 2015-0024, ALJ No. 2013-DBA-00010, slip op. at 4 (ARB Sept. 27, 2016) (quoting In re Thomas & Sons Bldg. Contractors, ARB No. 2000- 0050, ALJ No. 1996-DBA-00037, slip op. at 4 (ARB Aug. 27, 2001)). 80 Id. at 10 (quotation omitted). 11
‘loss of face’ in the business community.” 81 Debarment has long been considered the
80F
“death penalty” of procurement law as it can cut off the lifeblood of an employer or contractor’s business. 82 Given the severe impact of debarment, it is appropriate that
81F
agency impositions of debarments as a penalty be carefully reviewed.
Violations of the DBA by themselves do not constitute disregard of an
employer’s obligations within the meaning of the law. 83 To support debarment, the
82F
evidence must establish a level of culpability beyond negligence. 84 Disregard of
83F
DBA obligations must involve “some element of intent.” 85 The underpayment of
84F
prevailing wages, coupled with the falsification of certified payrolls, have constituted disregard of a contractor’s obligations to employees and, therefore, are sufficient to establish “intent” under the DBA debarment provisions. 86 In addition,
85F
an employer’s bad faith and an employer’s gross negligence regarding compliance have also been found to constitute disregard of DBA obligations. 87 Intentional
86F
failure to look at the law is also sufficient. 88 87F
81 See Gonzales v. Freeman, 334 F.2d 570 (D.C. Cir. 1964). Chief Judge Warren Burger, then a judge for the D.C. Circuit, first set the judicial stage for the propriety of debarment by recognizing that Perkins v. Lukens Steel Co., 310 U.S. 113 (1940), held that “no citizen has a ‘right,’” in the sense of a legal right, to do business with the government. However, the court found “that cannot mean that the government can act arbitrarily either substantively or procedurally, against a person or that such person is not entitled to challenge the processes and the evidence before he is officially declared ineligible for government contracts.” Gonzales, 334 F.2d at 574. 82 See Todd J. Canni, Shoot First, Ask Questions Later: An Examination and Critique of Suspension and Debarment Practice Under the FAR, Including a Discussion of the Mandatory Disclosure Rule, the IBM Suspension, and Other Noteworthy Developments, 38 PUB. CONT. L.J. 547 (2009); Daniel E. Schoeni, Personal Debarment for Non-Distributive Corporate Misconduct: On the Efficacy of Debarring the Individuals from Government Contracts for Collective Wrongdoing. 46 PUB. CONT. L.J. 51 (2016). 83 Interstate Rock Prods., Inc., ARB No. 2015-0024, slip op. at 4, 4 n.9 (“DBA violations do not, by themselves, constitute a disregard of an employer's obligations within the meaning of the law- to support debarment, the evidence must establish a level of culpability beyond negligence.”) (citing NCC Elec. Servs., Inc., ARB No. 2013-0097, ALJ No. 2012-DBA- 00006, slip op. at 8 (ARB Sept. 30, 2015) (“[a]n innocuous mistake may trigger a violation of the DBA, but such mistakes, especially those that do not result in harm to employees, do not necessarily evidence an employer’s disregard of its DBA obligations”). 84 Id. 85 Id. at 4-5 (citation omitted). 86 Id. at 5. 87 Id. 88 Id. 12
The ALJ acknowledged that Respondent had a clean history and cooperated
in the investigation. 89 However, the ALJ found these were “matters in extenuation
88F
and mitigation rather than relevant to the level of negligence related to the misclassification.” 90 The ALJ concluded that three factors supported “at least gross
89F
negligence or willful blindness” that justified debarment: (1) Respondent’s preexisting familiarity with the DBA, (2) Complainants’ signing into work with the incorrect classification, and (3) Cabral’s instruction to Complainants to drop their questions about their pay rate. 91 90F
Respondent contends that the ALJ erred in ordering that Respondent should
be debarred for three years. 92 Respondent asserts that debarment is not a strict
91F
liability result of any finding of a DBA violation but rather depends upon an employer’s intent and must rise to a level of culpability beyond negligence. 93 92F
Respondent contends that the factors the ALJ relied on in finding gross negligence do not justify a three-year debarment. 94 93F
We agree and find that the ALJ did not fulfill his duty of explanation in
finding that Respondent acted in gross negligence to justify a three-year debarment.
An ALJ has a duty to adequately explain why he credited certain evidence
and discredited other evidence. 95 An ALJ “need not address every aspect of [a
94F
party’s claim] at length and in detail,” but the findings “must provide enough information to [assure] the Court that he properly considered the relevant evidence underlying [the party’s] request.” 96 The ALJ must explain the relevant evidence in
95F
a manner that allows the Board to understand “what the ALJ did and why he did it.” 97
96F
89 D. & O. at 18.
90 Id.
91 Id.
92 Resp. Br. at 37.
93 Id. at 40.
94 Id.
95 5 U.S.C. § 557(c)(3)(A). Specifically, the ALJ must include a statement of “findings and conclusions, and the reasons or basis therefor, on all the material issues of fact, law, or discretion presented on the record.” Id. 96 Mazenko v. Pegasus Aircraft Mgmt., LLC, ARB No. 2021-0032, ALJ No. 2019-AIR- 00001, slip op. at 10-11 (ARB June 18, 2024) (quoting Mori v. Dep’t of the Navy, 917 F. Supp. 2d 60, 65 (D.D.C. 2013)). 97 Id. at 28 (quoting Printz v. STS Aviation Grp., ARB No. 2022-0045, ALJ No. 2021- AIR-00013, slip op. at 30 (ARB Dec. 15, 2023)). 13
The ALJ’s first factor supporting debarment is Respondent’s familiarity with
the DBA. However, the ALJ failed to connect Respondent’s familiarity with the DBA with gross negligence or willful blindness. As the ALJ found, Respondent has worked on DBA projects since its inception, and both of its owners, Luis and Veronica Palacios, have relevant experience with the DBA. 98 An intentional failure
97F
to look at the law could support a finding of gross negligence or willful blindness. 99 98F
However, the ALJ has not specifically found an intentional failure to look at the law or the CBA. Without a more thorough analysis regarding Respondent’s DBA history, we find that the ALJ’s analysis is insufficient to support a finding of gross negligence or willful blindness.
Next, the ALJ noted that WHD stated that Respondent directed
Complainants to sign-in as apprentices and later found that Complainants signing into work under the wrong classification demonstrated at least gross negligence. 100
99F
However, the ALJ did not indicate whether he found that Respondent directed the workers to sign-in as apprentices, and the record contains conflicting evidence.
The record shows that Jesus Torres, Christopher Garcia, and Miguel Garcia
signed-in as “apprentice.” 101 However, the record contains conflicting evidence as to
100F
whether Respondent directed them to sign-in as apprentices, or whether they did that of their own volition. Christopher Garcia testified that Adrian Cabral, a journeyman, told him to sign-in as an apprentice. 102 Similarly, Miguel Garcia
101F
testified that Cabral and Jorge Cobian, a Five Star superintendent, directed them to sign-in as apprentices. 103 However, Jesus Torres’s testimony contradicts the
102F
Garcia brothers. Torres testified that, while Cabral and Cobian called him an “apprentice,” he thought it was because it was a more professional way of referring to him. 104 He further stated that he switched from signing-in as “sprinkler” to
103F
“apprentice” on his own, and that the Garcias followed after him. 105 In addition,
104F
Cabral testified that he denied instructing any of the three laborers to sign in as apprentices. 106 When Cabral was questioned whether he signed Miguel Garcia in as
105F
an apprentice one day when Miguel was unable to sign-in, Cabral stated that he did
98 D. & O. at 3.
99 Interstate Rock Prods., Inc., ARB No. 2015-0024, slip op. at 5. 100 Id. at 17-18. 101 JX 23 at DOL 341, 2254, 2307, 2575, 2663, 2734, 2834. 102 Tr. at 183. 103 Id. at 440-41. 104 Id. at 566-70. 105 Id. 106 Id. at 300. 14
not read it as “apprentice,” but rather as “ayudante,” or “helper.” 107 The ALJ has
106F
not resolved this conflicting evidence. Based on this discrepancy and the ALJ’s lack of analysis, it is unclear what Respondent’s intent was and whether Complainants signing-in as apprentices rises to the level of gross negligence or willful blindness.
Lastly, the ALJ also noted that WHD argued that Cabral’s testimony that he
warned the Garcias that taking the matter of their pay rates to Cobian could get them taken off the job supported debarment. 108 The ALJ then found that this
107F
instruction demonstrated gross negligence. 109 However, the ALJ neither discussed
108F
the factual circumstances surrounding this claim, nor indicated what evidence he considered when reaching this conclusion apart from citing WHD’s assertion.
In WHD’s post-hearing brief before OALJ, WHD contended that Cabral
testified that he told the Garcia brothers not to discuss their pay rate with Cobian or else they would be pulled from the job. 110 Both Garcia brothers testified that they
109F
approached Cabral about their pay and that he instructed them not to raise the issue with Cobian or he would pull them from the job. 111 However, WHD’s third
110F
transcript citation does not pertain to this issue. 112 On the contrary, Cabral
111F
testified that neither Torres nor the Garcia brothers raised the issue of their pay with him. 113 The ALJ also failed to resolve this discrepancy, and thus it is unclear
112F
what Respondent’s intent was and whether this rose to gross negligence or willful blindness.
Thus, we find that the ALJ did not fulfill his duty of explanation in finding
that Respondent acted in gross negligence or willful blindness.
Accordingly, we AFFIRM the ALJ’s finding that Respondent violated the
DBA by misclassifying Complainants and owes Complainants $71,285.49 in back wages, VACATE the ALJ’s order that Respondent be debarred for three years, and REMAND for further consideration consistent with this opinion.
107 Id. at 115-16.
108 D. & O. at 18.
109 Id.
110 Administrator’s Post-Hearing Brief at 37.
111 Tr. at 187-88, 451-53.
112 Id. at 1173.
113 Id. at 298.
15
SO ORDERED.
ELLIOT M. KAPLAN
Administrative Appeals Judge
RANDEL K. JOHNSON
Chief Administrative Appeals Judge
THOMAS H. BURRELL
Administrative Appeals Judge
Does this precedent still control your case?
Ezel checks whether it still stands, including any court review since, and applies it to your situation with citations.