OSHRC ALJ decision Docket 97-1002 Decided July 30, 1998 Mixed result Judge Stephen J. Simko, Jr.

King Concrete Construction Company, Inc.

Willful fall violations and settlement yield $18,200

Apply this to your situation

This order from 1998 bound only the parties to this case; it isn't precedent. Ezel answers your situation under the current OSHA standards and Commission precedent, with citations.

Currency note: this decision dates from 1998
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final order, not Commission precedent
This decision by an OSHRC Administrative Law Judge became a final order of the Commission because no Commissioner directed review (29 U.S.C. § 661(j)). It binds the parties but is not binding precedent in other cases. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the Commission's own document.
Read the official release (oshrc.gov)

Plain-English summary

King Concrete performed concrete work on a barracks project at Fort Jackson, South Carolina. The company admitted that employees working on and near leading edges lacked required fall protection, but disputed OSHA's willful classification and proposed $49,000 penalty. The judge found the violations willful because King had fall-protection training and a written plan, yet repeatedly allowed employees to work 10 to 33 feet above the ground without effective protection despite frequent warnings. A grouped penalty of $9,800 was assessed for the two willful items. The judge also approved a partial settlement that withdrew some items, amended others, and assessed $8,400 for the remaining serious, repeat, and other-than-serious violations.

Decision snapshot

  • Cited standard(s): Multiple construction standards, including 29 C.F.R. § 1926.501(b)(2) and 29 C.F.R. § 1926.501(b)(2)(ii)
  • Outcome: Partial settlement approved; two leading-edge violations affirmed as willful; penalties total $18,200.
  • Key point: Repeatedly ignoring fall hazards after training, a written plan, and daily warnings supported a willful classification.

Full text (OSHRC public release)

Secretary of Labor, :
Complainant, :
:
v. : OSHRC Docket No. 97-1002
:
King Concrete Construction :
Company, Inc., :
Respondent. :

Appearances:

      Karen E. Mock, Esquire                       Mr. Joseph Gamboi
          Office of the Solicitor                      King Concrete Construction Co., Inc.
          U. S. Department of Labor                    Staten Island, New York
          Atlanta, Georgia                                  For Respondent
               For Complainant

Before: Administrative Law Judge Stephen J. Simko, Jr.

                                      DECISION AND ORDER

On June 3, 1997, the Secretary issued four citations to King Concrete Construction Company,

Inc. (King), for violations of 29 C.F.R. Part 1926. A hearing was held in Columbia, South
Carolina, on April 7, 1998. Prior to the hearing, the parties reached a partial settlement agreement
regarding Citation Nos. 1, 3, and 4. At the hearing, the respondent admitted that it violated 29
C.F.R. §§ 1926.501 (b)(2) and 1926.501(b)(2)(ii). It further admitted that these violations were
serious. Respondent disputes only the classification of the violations as willful and the Secretary's
proposed grouped penalty of $49,000.
Background
Sovran Construction, the general contractor, had a contract with the U.S. Army Corps of
Engineers to build barracks for enlisted soldiers at Fort Jackson, South Carolina. Sovran
subcontracted all concrete work to King. Respondent erected the concrete forms and placed all
steel. The general contractor poured the concrete. On February 14, 1997, respondent submitted
its fall protection plan which outlined protection for its employees while they were working on
concrete formwork at heights between 9 feet 10 inches and 33 feet above the ground. Prior to the
submission of this fall protection plan, respondent's supervisors were provided fall protection
training. This training was provided by the general contractor's insurance company in January 1997.
On this job, respondent employed approximately 48 construction employees, at least seven of whom
were designated as leading edge employees. These employees worked on elevated formwork on
the jobsite for at least three months prior to the Secretary's inspection which began on April 1, 1997.

                                            Violations

       Willful Citation 2, item 1, alleges a violation of 29 CFR 1926.501(b)(2) as follows:
       Each employee who was constructing a leading edge 6 ft. (1.8m) or more above
       lower levels was not protected from falling by guardrail systems, safety net systems,
       or personal fall arrest systems:

       (A) Employees engaged in leading edge work on the roof area of Building Number
       2, were not protected from falling and were exposed to falls of between 9 feet, 10
       inches and 33 feet.

       Willful Citation No. 2, item 1b, alleges a violation of 29 CFR 1926.501(b)(2)(ii) as follows:
       Each employee on a walking/working surface 6 feet (1.8M) or more above a lower
       level where leading edges were under construction, but who was not engaged in the
       leading edge work, was not protected by a guardrail system, safety net system, or
       personal fall arrest system:

       (a) Employees working near the leading edge work at the roof/attic area on
       Building #2, who were not engaged in leading edge work, were not protected from
       falling and were exposed to falls of between 9 feet, 10 inches and 33 feet.

                                           Willfullness

       The Secretary contends that King’s violations of §§ 1926.501(b)(2) and 501(b)(2)(ii) were

willful.
A willful violation of the Occupational Safety and Health Act of 1970, 29 U.S.C. §§
651-678 (“the Act”), is one committed with an “intentional, knowing or voluntary
disregard for the requirements of the Act or with plain indifference to employee
safety.” L. E. Myers, 16 BNA OSHC 1037, 1046, 1993-95 CCH OSHD ¶ 30,016,
pp. 41,123, 41,132 (quoting Williams Enterp., 13 BNA OSHC 1249, 1256, 1986-
87 CCH OSHD § 27,893, p. 36,589 (No. 85-355, 1987). “It is differentiated from
other types of violations by a heightened awareness--of the illegality of the conduct
or conditions--and by a state of mind--conscious disregard or plain indifference.”
General Motors Corp., Electro-Motive Div., 14 BNA OSHC 2064, 2068, 1991-93
CCH OSHD ¶ 29,240, p. 39,168 (N0. 82-630, 1991) (consolidated).

    Mobil Premix Concrete, Inc., 18 BNA OSHC 1010, 1013, 1997 CCH OSHD
    ¶ 31,416, p. 44,405 (No. 95-192, 1997).

    The OSHA inspection in this case did not occur until April 1,1997. Respondent, however,

was aware of the need for fall protection on the jobsite at least three months prior to that inspection.
In January 1997, the general contractor's insurance company provided a fall protection class to
respondent's management employees. The quality assurance representative for the Corps of
Engineers performed daily walk-around inspections. These inspections related to employee safety,
as well as the quality of the work of the various contractors. Problems involving respondent's lack
of fall protection for its employees were first noted by the Corps of Engineers’representative in late
February or early March 1997. Respondent's employees who worked on the leading edge of the
formwork, as well as those in other locations on top of the formwork, were not tied off, and no
other fall protection was provided for these employees. Respondent elected to use monitors to
watch its employees on the formwork, but they were not actually enforcing safety. The monitors
were not constantly watching employees, but performed other work, including carpentry work,
supervisory duties, and guiding the crane operator in the placement of materials atop the concrete
formwork. Respondent's employees were consistently found to be working on the edge of
formwork and on top of columns with no form of fall protection. These employees were exposed
to falls ranging from 10 to 33 feet. When employees were tied off, they were often tied off to cables
wrapped around unsecured rebar. This provided no protection for the exposed employees.
Representatives of the general contractor, the Army Corps of Engineers and the insurance carrier
repeatedly warned respondent's management about the lack of fall protection. Respondent often
agreed to protect these employees, but later allowed the same employees to be exposed to these
same fall hazards with no protection. The general contractor and the Army Corps of Engineers
reported a great deal of defiance from respondent concerning fall protection matters. On several
occasions, respondent agreed to provide fall protection only after confrontation with these
representatives.
Respondent demonstrated its recognition of the need to protect its employees working on
top of the formwork by developing a fall protection plan and by providing monitors to watch
employees working at elevations ranging from 10 to 33 feet above the ground. It demonstrated
reckless disregard for the requirements of the Act and plain indifference for employee safety by
allowing its monitors to perform work functions other than directly watching the movements of
unprotected employees working at or near the edge of elevated formwork. The intentional nature
of respondent's behavior is further demonstrated by its recurrent and ongoing failure to provide
any form of fall protection for these workers except when forced by the general contractor or safety
representatives of the Army Corps of Engineers. Prior to the OSHA inspection, respondent was
confronted almost daily by these individuals regarding its lack of concern for the safety of its
formwork employees.
Respondent's violations were clearly willful. King demonstrated both reckless disregard for
the requirements of the Act and plain indifference for employee safety.

                                       Penalty

   Under §17(j) of the Act, in determining the appropriate penalty, the Commission must give

due consideration to the size of the employer's business, the gravity of the violation, the good faith
of the employer and the history of previous violations.

   At the time of the OSHA inspection, King had forty-eight employees, all of whom worked

on this jobsite. Normally, King employs fewer than ten people in its entire operation. These
violations are of high gravity. If workers fell from the elevated formwork, the likely result would
be death or serious physical injury. The classification of the violations as willful mitigates against
a finding of good faith. King has a history of only one previous violation during the past three
years. That violation did not involve the issue of fall protection for employees.
Upon due consideration of these factors, it is determined that a penalty of $9,800 is
appropriate.
At the conclusion of the hearing, a decision was issued from the bench affirming the partial
settlement agreement and afffirming the willful violations as alleged and assessing a grouped penalty
of $9,800 for those violations.

                                 FINDINGS OF FACT
                              AND CONCLUSIONS OF LAW

   The foregoing decision constitutes the findings of fact and conclusions of law in accordance

with Federal Rules of Civil Procedure 52(a).

                                          ORDER

   Based upon the foregoing decision, it is hereby ORDERED:

   The terms of the partial settlement agreement reached by the parties prior to the hearing and

read into the record are approved as follows:
Citation No. 1 is amended as follows:
1. Item 3 is renumbered as item 2c.
2. Items 4a and 4b -- references to Building 8 are deleted.
3. Items 7, 8 and 10a and 10b are withdrawn.
Citation No. 4 is amended as follows:
1. Items 1a, 1c, 2 and 3 -- references to Building 8 are deleted.
2. Item 1b is withdrawn.
Pursuant to the partial settlement agreement, the following violations are affirmed, as
classified, and the following penalties assessed:
Citation Item Standard Penalty
No. No. Violated Assessed

   1 (Serious)              1a & 1b              29 C.F.R. § 1926.302(e)(12)       $ 450

   1 (Serious)             2a & 2b               29 C.F.R. § 1926.304(f)           $ 750
                           2c                    29 C.F.R. § 304(i)(1)

    1 (Serious)            4a                    29 C.F.R. § 1926.451(h)(4)(ii)    $ 600
                           4b                    29 C.F.R. § 1926.501(c)(1)

   1 (Serious)             5                     29 C.F.R. § 501(b)(1)                      $

450

   1 (Serious)             6                     29 C.F.R. § 1926.502(b)(2)        $ 450

   1 (Serious)             9a                    29 C.F.R. § 1926.502(h)(1)(iii)   $1,500
                           9b                    29 C.F.R. § 1926.502(h)(1)(v)

   1 (Serious)             11                    29 C.F.R. § 1926.502(k)(5)        $1,650

   1 (Serious)             12                    29 C.F.R. § 1926.652(a)(1)        $ 750

   3 (Repeat)              1                     29 C.F.R. § 1926.550(a)(4)        $1,500

   4 (Other)               1a                    29 C.F.R. § 1926.25(a)            $ 300
                           1c                    29 C.F.R. § 1926.25(b)

   4 (Other)               2                     29 C.F.R. § 1926.451(b)(1)           -0-

   4 (Other)               3                     29 C.F.R. § 1926.452(i)(7)           -0-

Citation No. 2

   Item 1a, in violation of 29 C.F.R. § 1926.501(b)(2), and item 1b, in violation of

§ 1926.501(b)(2)(ii), are affirmed as willful violations and a grouped penalty for items 1a and 1b
of $9,800 is assessed.

                                         STEPHEN J. SIMKO, JR.
                                         Judge

Date: June 8, 1998