D'Ambra Construction Company, Inc. (ALJ decision, July 18, 1997)

Utility-location violation affirmed with reduced penalty

Decision type
ALJ decision
Docket
97-0150
Decided
July 18, 1997
Presiding judge
Outcome
Modified
Precedential status
Final order, not precedent
Checked against source
2026-07-23
Cited standards

Apply this to your situation

This order from 1997 bound only the parties to this case; it isn't precedent. Ask about your situation and see what the current OSHA standards and Commission precedent say, with citations.

Currency note: this decision dates from 1997
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Final order, not Commission precedent
This decision by an OSHRC Administrative Law Judge became a final order of the Commission because no Commissioner directed review (29 U.S.C. § 661(j)). It binds the parties but is not binding precedent in other cases. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the agency's own release.
Read the official release (oshrc.gov)

Plain-English summary

D'Ambra Construction was cited for beginning excavation work without first determining the location of an underground gas line. The judge issued a bench decision after an E-Z Trial hearing. The serious violation was affirmed. The proposed $4,000 penalty was reduced to $1,000.

Decision snapshot

  • Cited standard(s): 29 C.F.R. § 1926.651(b)(1)
  • Outcome: The serious utility-location violation was affirmed, and the penalty was reduced from $4,000 to $1,000.
  • Key point: An employer must determine the estimated location of underground utilities before opening an excavation.

Full text (OSHRC public release)

:
SECRETARY OF LABOR,
:
Complainant,
:
:
v. : OSHRC
: Docket No. 97-0150
D’AMBRA CONSTRUCTION
:
COMPANY, INC.,
:
Respondent.
:
:
:

Appearances:
Kevin E. Sullivan, Esq.
Christopher J. Maxwell, Vice President
Office of the Solicitor
D’Ambra Construction Company, Inc.
U.S. Department of Labor
Warwick, Rhode Island
For Complainant
For Respondent
Before: Administrative Law Judge Robert A. Yetman DECISION AND ORDER
This proceeding arises under § 10(c) of the Occupational Safety and Health Act of 1970, 29 U.S.C. § 651, et seq (“the Act”) to review a citation issued by the Secretary of Labor pursuant to § 9(a) of the Act and a proposed assessment of penalty thereon issued pursuant to § 10(a) of the Act.
On January 13, 1997, Respondent D’Ambra Construction Company was issued one serious citation alleging a single violation of the standard set forth at 29 CFR 1926.65(b)(1). The citation reads as follows:
29 CFR 1926.651(b)(1): The estimated location of underground utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, was not determined prior to opening an excavation:

(a) Jobsite: The location of an underground gas line was not determined prior to excavation operations.
A penalty in the amount of $4,000 was proposed by the Secretary. Respondent filed a timely notice of contest and this matter was assigned for E-Z Trial proceedings pursuant to commission Rules 29 CFR 2200.200 et seq. A hearing was conducted on April 25, 1997 and in accordance with Commission Rule 209(f), a decision was issued from the bench affirming the citation as a serious violation and assessing a penalty in the amount of $1,000. Findings of fact and conclusions of law as required by commission Rule 90(a) are set forth at transcript pages 118 to 125 attached hereto.
All findings of fact relevant and necessary to a determination of the contested issues have been made as required by Fed. R. Civ. P. 52(a). All proposed findings of fact and conclusions of law inconsistent with this decision are denied.
ORDER
Serious Citation No. 1, Item No. 1 alleging a violation of 29 CFR 1926.651(b)(1) is affirmed and a penalty in the amount of $1,000 is assessed.

ROBERT A. YETMAN
Judge, OSHRC

Dated:
Boston, MA

2

What applies to your situation today?

This order bound one employer. Ezel checks the current OSHA standards and Commission precedent against your facts, with citations.