Delta Line Construction placed a utility-truck bucket over an open highway lane while an employee rewired a traffic signal. A tractor-trailer struck the bucket, separating it from the boom, and the employee fell and sustained serious injuries. The judge found that the applicable traffic-control guidance required closing the lane rather than using the shoulder-work setup chosen by Delta. Lane closure was feasible under the project specifications, and Delta did not prove that closure created a greater hazard. The employee-misconduct defense also failed because the foreman observed the bucket below the signal and Delta had assigned a flagman to redirect trucks. The serious violation was affirmed with a $5,000 penalty.
Decision snapshot
- Cited standard(s): 29 C.F.R. § 1926.202
- Outcome: The serious barricade violation was affirmed, and a $5,000 penalty was assessed.
- Key point: Short-duration signal work over an active traffic lane required lane closure when the employee and bucket remained within the traffic zone.
Full text (OSHRC public release)
United States of America
OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION
1120 20th Street, N.W., Ninth Floor
Washington, DC 20036-3419
SECRETARY OF LABOR, :
:
Complainant, :
:
v. : OSHRC DOCKET NO. 96-0462
:
DELTA LINE CONSTRUCTION :
COMPANY, :
:
Respondent. :
APPEARANCES:
Luis S. Micheli, Esquire Al Smith
New York, New York Surf City, New Jersey
For the Complainant. For the Respondent, pro se.
Susan E. Houde
Egg Harbor Township, New Jersey
For the Respondent, pro se.
Before: Chief Judge Irving Sommer
DECISION AND ORDER
This proceeding is before the Occupational Safety and Health Review Commission (“the
Commission”) pursuant to section 10 of the Occupational Safety and Health Act of 1970, 29 U.S.C.
§ 651 et seq. (“the Act”). The Occupational Safety and Health Administration (“OSHA”) inspected
a work site of Respondent Delta Line Construction Company (“Delta”) pursuant to an accident on
August 29, 1995; the accident involved a Delta employee who was rewiring a traffic signal from the
bucket of a utility truck located at the intersection of Route 9 South and Old Mill Road, in Old Bridge
Township, New Jersey. As a result of the inspection, Delta was issued a serious citation alleging a
violation of 29 C.F.R. 1926.202. Delta contested the citation, and the hearing in this matter was held
on October 31, 1996. Both parties have submitted post-hearing briefs.
2
Background
Delta’s work at the subject site was part of a 27-mile traffic signal project pursuant to its
contract with the New Jersey Department of Transportation (“NJDOT”). At the time of the accident,
Delta’s utility truck was parked on the shoulder of Route 9 South just south of Old Mill Road.1 The
truck was facing north with its bucket suspended over the right lane of Route 9 South such that
Byron Price, Delta’s employee, could perform the rewiring work on the traffic signal, which was not
operating at that time. Before Price began his work, Delta blocked off Old Mill Road with orange
traffic cones, placed cones around the utility truck, and stationed a flagman about 700 feet north of
the intersection; however, none of the lanes of Route 9 South was closed to traffic, and the accident
occurred when a tractor/trailer driving in the right lane went under the traffic signal and the top of
the trailer struck the bucket, resulting in the bucket separating from the truck’s boom and Price
sustaining serious head and leg injuries when he fell to the street below.2
The accident occurred about 1:10 p.m., and the Old Bridge Police Department (“OBPD”) was
at the scene almost immediately. Pursuant to C-7-8, the reports of the OBPD investigation, the
tractor/trailer had a registered height of 13.5 feet and the bottom of the bucket had been about 4
inches lower than the top of the trailer. The driver of the tractor/trailer informed the OBPD that he
had seen the flagman, the orange traffic cones and the utility truck and bucket but had proceeded
south in the right lane because it was not blocked off and because it appeared to him that the bucket
was the same height as the traffic signal. Delta’s flagman told the OBPD that his job was to direct
trucks out of the right lane and into the center lane and that he had so directed the tractor/trailer but
it had not complied. Witnesses told the OBPD the right lane had not been closed off and indicated
they had seen nothing telling them of the work ahead, leading the OBPD to conclude that the work
site had been improperly protected and that motorists were inadequately warned. The OSHA
compliance officer (“CO”) who inspected the site the following day also concluded that the site was
1
Route 9, a heavily-traveled road with a speed limit of 55 miles per hour, has three lanes going
north and three lanes going south and a grassy median in the middle.
2
Price was wearing a safety belt and was tied off to the truck’s boom, and although he was
suspended briefly from the boom after the trailer hit the bucket he then fell to the ground.
3
improperly protected and that Delta should not have allowed Price to work over the open traffic lane;
C-6 is the CO’s report of the OSHA inspection.
The Parties’ Contentions
The citation in this case alleges that barricades for the protection of the employees at the site
did not conform with ANSI D6.1 Manual on Uniform Traffic Control Devices for Streets and
Highways (“MUTCD”), in violation of 29 C.F.R. 1926.202. That standard states as follows:
Barricades for protection of employees shall conform to the portions of the American
National Standards Institute D6.1-1971, Manual on Uniform Traffic Control Devices
for Streets and Highways, relating to barricades.
The Secretary contends that Delta was required to barricade the lane over which Price was
working as in C-5, an illustration from the MUTCD showing a short-duration operation on a divided
roadway with one lane closed; specifically, C-5 depicts a vehicle in the right lane with channelizing
devices around it and the signs to be used to warn of the lane closure. Delta contends that its
barricading of the utility truck complied with R-4, another illustration from the MUTCD depicting
a vehicle on the shoulder with barricades around it and the signs to be used. Delta also contends that
working in a bucket over a “live lane” is a standard practice in traffic signal work, that lane closure
in this case would have been infeasible and a greater hazard, and that the accident would not have
occurred if Price had not violated the specified procedure for the job.
The Relevant Testimony
Jeffrey Houde, Delta’s field supervisor, testified that Price’s job involved rewiring the traffic
signal and removing the temporary cable that went between the subject signal and the signal on the
center median. He further testified the cable removal required working over all three lanes and that
closing the road was infeasible, indicating the entire job took only 20 to 30 minutes, that this same
job had to be done about 168 times, and that the road could not have been closed each time. Houde
noted Price was operating the bucket himself, that he was to have positioned the top of the bucket
with the top of the signal, which was 42 inches long, the same length as the bucket, and that if he had
he could have done the job safely as he would have been 15.5 feet above the road, the standard height
for traffic signals; he also noted that while Delta had a foreman at the site it was up to Price to
position the bucket, as the foreman might not have been able to tell its height, and that Price was also
to keep an eye on the traffic and stop work if he felt unsafe. Houde said that although the
4
tractor/trailer ignored the flagman it would have been able to proceed safely if the bucket had been
even with the signal, and that while the MUTCD did not address this job the procedure in R-4 was
standard practice for signal work and the NJDOT approved of it. (Tr. 67-68; 73-92; 96-100).
Susan Houde, Delta’s president, testified the company has been in business for 40 years, that
it has never had a fatality, and that it has had very few lost workdays due to injuries. She further
testified that Delta’s traffic control plans are governed by the specifications for its jobs and safety
considerations for its employees and the public. Houde said the work at the site was not part of the
original contract but rather part of a “change order” involving temporary wiring for signals. She also
said the OBPD had been under contract to provide traffic protection for the project and that when
it failed to appear at the site due to being at another intersection Delta’s foreman had conferred with
NJDOT, which had advised him to proceed as the work was outside the traffic zone. Houde noted
the project contract provided for lane closure in some circumstances and that the MUTCD sets out
the use of barricades and channeling devices for road work; however, she also noted the situation at
the site was not addressed in the MUTCD, that the method Delta used was a standard practice, and
that the MUTCD allows for consideration of factors such as duration of the work. (Tr. 102-18).
Francis Glancey, a former senior engineer with the NJDOT, testified that his 25 years with
the agency had involved drawing up traffic signal construction specifications and overseeing such
construction, including road detours and barricades. He further testified that working in a bucket
over a live lane was done often and safely in signal work, and that while there was nothing about this
method in the MUTCD his opinion was that R-4 applied to it and that based on his knowledge of the
site Delta had complied with the MUTCD. Glancey said the utility truck’s boom length would not
have allowed Price to work beyond the center lane, that he understood Price was to be working over
only the right and center lanes, and that although both could have been closed it takes over 2.5 hours
just to shut down a lane; he also said the five workers needed for a closure would be exposed to
traffic, while a worker over a live lane above the traffic zone would be at less risk. (Tr. 120-56).
Lee Steiner has a degree in engineering technology and has worked for NJDOT for 16 years.
He testified that all of his experience with the agency had involved responsibility for reviewing traffic
control plans for construction projects, inspecting construction sites, and adapting traffic control plans
to those sites. He further testified that C-10, the project contract, provided for lane closure on Route
5
9 South on weekdays from 8:00 p.m. to 2:00 p.m. in areas having three lanes and shoulders over 10
feet wide. Steiner noted the accident had occurred around 1:10 p.m. and offered his opinion, based
on the MUTCD, that the proper setup would have been to close the lane over which Price was
working. He said it takes about an hour to close a lane and another hour to open it back up and that
the least expensive means is to utilize traffic cones; he also said that a full setup should be done for
any road work lasting over 15 minutes, that R-4 did not apply to the situation at the site because it
pertains to work on shoulders, and that the NJDOT standard specifications preclude construction
work over live traffic unless it is provided for in the job specifications or an engineer has given written
permission for such work to take place. (Tr. 157-67).
Decision
Based on the record, I conclude the Secretary has demonstrated a violation of the cited
standard. The language of the standard is mandatory and requires compliance with the MUTCD, and
of the two illustrations from the MUTCD presented by the parties, C-5 and R-4, I find that C-5 is
more applicable to this case. It is clear from its caption and text that R-4 applies to work occurring
on shoulders, while C-5, according to its caption, applies to “daytime maintenance operations of short
duration on a 4-lane divided roadway where half of roadway is closed.” It is also clear that Price’s
work at the time of the accident was not on the shoulder but rather over the right lane, which was not
closed to traffic, and that due to the bucket’s height he was within the traffic zone of the right lane.
Moreover, Steiner’s testimony was persuasive evidence that Delta was required to close the lane,
and although Glancey testified to the contrary, Steiner’s opinion is credited over that of Glancey due
to his particular work experience with the NJDOT, all of which has been in the area of traffic control.
Delta was therefore in violation of the standard unless the evidence establishes one of the affirmative
defenses indicated in the company’s contentions, supra.
Delta contends that lane closure in this case was infeasible. An employer asserting infeasibility
of compliance must demonstrate (1) that literal compliance with the standard was infeasible under
the circumstances, and (2) that either an alternative means of protection was used or no alternative
means was feasible. See State Sheet Metal Co., 16 BNA OSHC 1155, 1160-61 (Nos. 90-1620 & 90-
2894, 1993), and cases cited therein. Delta has not met the first part of its defense for several
reasons. First, although Jeffrey Houde indicated otherwise, Glancey testified that the job involved
6
working only over the right and center lanes and that both could have been closed. Second,
Glancey’s estimate of over 2.5 hours just to shut down a lane was contradicted by Steiner’s testimony
that lane closure takes about an hour, and for the reasons noted above, Steiner’s opinion is credited
over that of Glancey. Third, as Steiner noted, pages 36-37 of C-10, the project contract, provided
for lane closure on Route 9, and it is apparent that the makeup of Route 9 South at Old Mill Road
(three lanes and a 12-foot shoulder3) as well as the day of the week and the time of the accident
(Tuesday at 1:10 p.m.) met C-10’s lane closure specifications. Fourth, as Steiner also noted,
NJDOT’s standard specifications prohibit construction work over traffic unless it is provided for in
the job specifications or an engineer has given written permission for such work to take place, and
Delta presented nothing to show either of these conditions. Delta also failed to meet the second part
of its infeasibility defense, in that the alternative measure of working in a bucket over the right-hand
lane, as it was done in this case, afforded inadequate protection. Delta’s contention that compliance
with the standard was infeasible is therefore rejected.
Delta also contends compliance was a greater hazard. To demonstrate this affirmative
defense, an employer must show (1) that the hazards of compliance were greater than those presented
by not complying, (2) that alternative protective means were used or were not available, and (3) that
applying for a variance would have been inappropriate. State Sheet Metal Co., 16 BNA OSHC 1155,
1159 (Nos. 90-1620 & 90-2894, 1993). As set out above, Glancey indicated that the five workers
who would have been needed to effectuate a lane closure would have been exposed to a greater
hazard than the one employee who was working over a live lane of traffic in a bucket. However, in
view of the circumstances under which Price was working, which clearly exposed him to the hazard
of being struck by vehicular traffic, Glancey’s testimony does not establish the first part of Delta’s
defense. These circumstances also preclude Delta from establishing the second part of its defense,
making it unnecessary to address whether application for a variance from the standard was
inappropriate. Delta’s greater hazard defense is accordingly rejected.
Delta’s final contention is, in essence, that the accident was the result of unpreventable
employee misconduct. To prove this affirmative defense, an employer must show (1) that it had work
3
Susan Houde testified the width of the shoulder in the subject area was 12 feet. (Tr. 117).
7
rules designed to prevent the violation, (2) that it had adequately communicated the rules to its
employees, (3) that it had taken steps to detect violations, and (4) that it effectively enforced the rules
when violations were detected. Jensen Constr. Co., 7 BNA OSHC 1477, 1479 (No. 76-1538, 1979).
As noted supra, Jeffrey Houde testified Price was to have positioned the bucket even with the signal,
both of which were 42 inches long; that doing so would have enabled him to perform the job safely
as he would have been 15.5 feet above traffic; that it was up to Price to position the bucket, as the
foreman might not have been able to tell its height; and that Price was also to keep an eye on traffic
and stop work if he felt unsafe.4 (Tr. 75-85; 90; 97-98). However, Houde also testified that Price
was working on the face of the signal and had just opened its center section to do the rewiring and
that the foreman, who had been watching him, turned away right before the accident occurred. (Tr.
73-74; 79-82). This testimony defeats Delta’s employee misconduct defense and explains why the
accident happened. The bucket and signal were both 42 inches long, and Price, whose upper body
had to have been at least 2 feet above the top of the bucket, could not have worked on the signal’s
center section unless the bucket was lower than the signal, and in this case it was over 2 feet lower.
Further, if the foreman was watching Price he had to have been aware the bucket was lower than the
signal, and that Delta knew the height at which Price was going to be working is supported by its
having stationed a flagman north of the area to wave trucks out of the right lane. Finally, Houde’s
testimony that Price was to watch out for traffic does not follow in light of his other testimony that
Price was working on the signal’s face, which meant that he would have been facing the signal and
had his back to the traffic. It is clear that the accident was not caused by unpreventable employee
misconduct and that Delta was in violation of the standard.
Turning to the assessment of an appropriate penalty, the Commission considers the
employer’s size, history and good faith, as well as the gravity of the condition, when assessing
penalties, with the gravity of the violation being given the most weight. The record shows that Delta
is a small employer with no history of prior OSHA violations. (Tr. 27-28; 36-37). However, the
record also clearly shows a high-gravity condition, in that Price was working within the traffic zone
of a live lane of traffic, which in my view precludes any reduction in penalty for good faith. In
4
Houde indicated that Price had been told a number of times that the height of tractor/trailers
in New Jersey was 13.5 feet. (Tr. 81).
8
addition, the hazard of the condition was compounded by the fact that Delta’s flagman had been with
the company for only about two weeks and that August 29 was his first day to work as a flagman.
(Tr. 55-56). The hazard was further compounded by the fact that while Delta had evidently posted
a construction sign north of the site there was insufficient notice to motorists of the work ahead. (Tr.
57; 63-64; C-6, pp. 3-5; C-7, p. 2; C-8). The problem in this case appears to have been, as indicated
by the testimony of Susan Houde, that the OBPD was unable to provide traffic control protection at
the site that day due to being at another intersection. Regardless, this does not excuse Delta’s failure
to provide adequate protection for its employees at the site, and it is my conclusion, after considering
the record as a whole and all of the factors noted above, that a penalty of $5,000.00 is appropriate
in this case.
Conclusions of Law
1. Respondent Delta Line Construction Company is engaged in a business affecting
commerce and has employees within the meaning of section 3(5) of the Act. The Commission has
jurisdiction of the parties and of the subject matter of the proceeding.
2. Respondent was in serious violation of 29 C.F.R. 1926.202.
Order
Based on the foregoing Findings of Fact and Conclusions of Law, it is ORDERED that:
1. Citation 1 is AFFIRMED as a serious violation, and a penalty of $5,000.00 is assessed.
Irving Sommer
Chief Judge
Date:
Get today's answer for your situation
You just read what one judge decided for one employer in 1997, and it binds only those parties. Ezel checks the current OSHA standards and Commission precedent and answers your specific situation, with citations.
Opens in Ezel Pro. Every answer cites the authority it relies on.