OSHRC Commission decision Docket 87-1067 Decided April 30, 1991 Mixed result

Archer-Western Contractors, LTD., and Gilbert Corp. Of Delaware, Inc., A Joint Venture

Crane-overload violation affirmed, training item vacated

Apply this precedent to your situation

This is citable Commission precedent from 1991, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 1991
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Decision of the Commission
This is a decision of the Occupational Safety and Health Review Commission, the highest level of agency review, citable as Commission precedent. It may have been appealed to a U.S. Court of Appeals after issuance; check subsequent history before relying on it. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the Commission's own document.
Read the official release (oshrc.gov)

Plain-English summary

Archer-Western Contractors and Gilbert Corporation of Delaware operated a joint venture constructing an airport terminal in West Palm Beach, Florida. A tower crane collapsed after supervisors pressed the crane operator to lift a concrete stairwell form despite repeated warnings that the load exceeded the crane's capacity. The Commission affirmed a willful violation of 29 C.F.R. § 1926.550(a)(1), rejected the joint venture's reliance-on-a-specialist and supervisory-misconduct defenses, and assessed the stipulated $10,000 penalty. It found intentional disregard because managers continued to demand the lift, declined to use another suitable crane, and provided a written weight figure that contradicted the known estimates. The Commission vacated the separate training item under 29 C.F.R. § 1926.21(b)(2) because crane operators testified that employees performed rigging and signaling adequately, and the joint venture could reasonably rely on the crane contractor's expertise regarding load capacity.

Decision snapshot

  • Cited standard(s): 29 C.F.R. § 1926.550(a)(1); 29 C.F.R. § 1926.21(b)(2)
  • Outcome: Willful crane-overload violation affirmed with a $10,000 penalty; serious training item vacated.
  • Key point: An employer cannot rely on a crane specialist after pressuring that specialist to disregard repeated overload warnings, but reasonable reliance may satisfy training duties on matters within the specialist's expertise.

Full text (OSHRC public release)

Docket No. 87-1067

SECRETARY OF LABOR,

Complainant,

v.

ARCHER-WESTERN CONTRACTORS, LTD,

and GILBERT CORP of DELAWARE,

a JOINT VENTURE,

Respondent.

OSHRC Docket No. 87-1067

DECISION

Before: FOULKE, Chairman, and WISEMAN, Commissioner.

BY THE COMMISSION:

This case involves the collapse of a Manitowac 4000-W tower crane at a construction
site in West Palm Beach, Florida on April 28, 1987. As a result of that collapse and a
subsequent inspection by the Occupational Safety and Health Administration
("OSHA"), the Joint Venture of Archer-Western Contractors, Ltd. and Gilbert
Corporation of Delaware (hereinafter "the Joint Venture" or
"Respondent") was issued two citations, each of which alleged several violations
of the Occupational Safety and Health Act, 29 U.S.C. �� 651-678 ("the Act") .
Two items are before the Commission on review: citation 2, item 2 alleging a willful
violation of 29 CFR � 1926.550(a)(1) for exceeding the lifting capacity of the crane; and
Citation 1, item 1 alleging a serious violation of 29 C.F.R. � 1926.21(b)(2) for failing
to instruct employees in the recognition and avoidance of unsafe conditions.[[1/]]

Administrative Law Judge Joseph D. Sparks affirmed both violations and assessed the
penalties proposed by the Secretary. Respondent filed a Petition for Discretionary Review
that was granted by the Commission. For reasons that follow, we affirm the willful
violation of � 1926.550(a)(1) and vacate the item alleging noncompliance with �
1926.21(b)(2).

A. The Crane Collapse--29 CFR � 1926.550(a)(1)

The Joint Venture was engaged in the construction of
a terminal at the Palm Beach International Airport, and had contracted with Construction
Equipment International (CEI) to provide the necessary cranes and operators. The contract
did not require CEI to provide any other personnel or equipment, such as signalmen or
rigging.

On April 28, 1987, the Joint Venture decided to lift a Burke core form from stairwell
number four. Cement is poured into a core form to construct a stairwell. The Burke form at
stairwell four measured 15 by 27 feet and was from 9-14 feet high. CEI operator James Earl
Dickey was operating the Manitowac 4000-W crane that was to make the lift. The crane had a
tower attachment of 133 feet, 160 feet of working boom and a 40-foot jib. Dickey was
concerned that the form exceeded the capacity of the crane. He told one of 
Respondent's foremen, David Stuart, that the crane's capacity was 14,800-14,900 pounds and
asked for the weight of the form. Stuart estimated the form to weigh 16-17,000 pounds.
Because the form exceeded the capacity of the crane, Dickey refused to make the lift.
Stuart then went to CEI lead operator Rodney Walters to inform him of Dickey's refusal. He
also informed Walters that CEI had made the lift before. Walters told Stuart that they
were not going to make any more questionable lifts. Stuart then reported the situation to
Respondent's project manager Paul Payne and engineer Joseph Appleton. Payne and Appleton
were under the impression that the Manitowac 4000 had lifted the Burke form before and
questioned why the lift could not be made again. Payne told Stuart that it was important
to make the lift. He ordered Stuart to get the form ready and stand by. Payne called
Michael Lothian, a general manager at CEI headquarters in Tampa, and asked him to explain
why CEI was refusing to make the lift.

Lothian explained that, based on their operator's previous experience in lifting the
form, CEI believed that the form's weight exceeded the capacity of the crane. Payne ended
the telephone conversation and recalculated the weight to be 15-16,000 pounds. He then
telephoned Lothian and told him of this new calculation, that the form weighed 15,300
pounds. Lothian pointed out that, according to the load chart, the weight was well in
excess of the crane's capacity. Payne replied that it was only 1300 pounds over the
capacity and asked what was wrong with making the lift. Lothian pointed out that to the
weight of the form must be added the 1000-pound ball, and the weight of the wire rope and
other rigging. Lothian told Payne that if the weight of 15,300 pounds did not include
those items, the lift could exceed the capacity of the crane by as much as 20%.

Lothian testified that he told Payne that the discussion was not necessary because
there was another crane at the site, a Manitowac 3900, capable of handling the load.
Lothian stated that after he explained that the other crane would have to be rerigged to
make the lift, Payne complained that it was a lot of work "for one lousy pick,"
but he finally agreed to it.

Payne's version of the conversation varies from Lothian's in important respects.
Payne testified that Lothian told him that the jib capacity was not high enough to make
the lift and that it would have to be rerigged to make the lift. Thus, while Lothian
testified that he told Payne that the Manitowac 4000 was incapable of making the lift
under any circumstance, Payne apparently believed that the crane could make the lift if it
were properly rerigged.

Payne testified that immediately after this conversation with Lothian, he told his
foreman, Thomas Link, not to make the lift with the Manitowac 4000 until it was rerigged.
Link agreed not to make the lift. However, Stuart, a foreman who worked for Link,
testified that Link ordered him to have the crane readied for the the lift. Link did not
order the crane rerigged. When CEI head operator Walters learned that the lift was to be
made, he told Link that he thought the form weighed over 18,000 pounds and that he would
not allow the lift until he had authority from his superiors in Tampa. After calling
Tampa, Walters suggested to Link that there was an "out." Walters said that
Tampa agreed to allow the lift if Link or another member of Respondent's management would
certify that the form weighed 12-14,000 lbs. and provide a release of liability. [[2/]]
Link took out a piece of note paper, wrote "STAIR #4 12,000 PDS T. Link" and
handed it to Walters. Link then ordered foreman Stuart to get things ready and to tell the
operator to make the lift. Crane operator Dickey continued to protest that the lift was
unsafe. Finally, Dickey agreed to make the lift, although he continued to maintain he was
being forced into it. Respondent's safety manager Ford, after talking to Stuart and
Dickey, instructed employees not to ride the form during the lift.

Respondent's employees loosened the jacks holding the form. Stuart then signaled
Dickey to make the lift. The form rose for 10-15 seconds, then dropped back on the jacks.
The lifting beam struck the top of the form. Metal and debris began to fall as the jib and
boom of the crane collapsed. Employees ducked and ran into the building to avoid the
falling debris.

Payne testified that, after the accident, he asked Link why he authorized the lift.
According to Payne, Link admitted his error. He told Payne that because they had
previously made a similar lift, he believed they could make this lift. Payne testified
that because he authorized the lift, Link was terminated for insubordination on May 12,
1987, two weeks after the lift.

Judge Sparks found that the evidence was undisputed that the maximum lifting capacity
of the crane was 14,000 pounds and that the weight of the load was at least 20,000 pounds.
He affirmed a willful violation of 29 C.F.R. �1926.550(a)(1) [[3/]] and assessed the
$10,000 proposed penalty. The judge specifically rejected  Respondent's contention
that it was not responsible for the violation because it was only the lessor of the crane.
He noted that contractors were absolved of responsibility for crane related violations
only when the lessor relied on the expertise of the crane operator. Here, the judge found,
Respondent did not rely on the operator's expertise. Rather, contrary to the advice of the
operator and with full knowledge that the lift exceeded the capacity of the crane,
Respondent insisted that the overweight lift be made. He concluded that Respondent was
directly responsible for the violation.

Judge Sparks also discredited Payne's testimony that Link authorized the lift in
direct violation of his specific orders. The judge found it highly unlikely that foreman
Link would have ordered the lift against Project Manager Payne's orders and against the
advice of all crane operators. He further noted that other supervisory personnel were
aware that the load exceeded the crane's capacity, yet allowed the lift to be made.

B.

Respondent first argues that the evidence did not
establish the lifting capacity of the crane.[[4/]] It claims that the only evidence cited
by the judge in support of his finding that the lift capacity of the crane was 14,000
pounds was a Manitowac chart for tower cranes with tower attachments between 163-213 feet
in height. However, the actual height of the tower used in the lift was 133 feet. There is
no evidence, Respondent continues, which suggests that the chart applies to the 133 foot
tower. Respondent concludes that the Secretary's failure to establish the manufacturer's
rated load capacity for the tower crane requires that the citation be vacated. This
argument is rejected.

As Respondent properly notes, the load charts introduced into evidence do not
directly address the particular configuration of the crane at the time it made the
ill-fated lift. The chart covers cranes with towers of 163 to 213 feet, and boom lengths
of 150 feet. The crane in use, however, had a 133-foot tower and a 160-foot boom. For
those dimensions, the chart does list the maximum lift capacity with a 40-foot jib to be
14,000 pounds. The maximum lift capacity listed for the crane is 20,000 pounds with a
30-foot jib. The load chart also states that when determining the load all blocks, hooks,
weight balls, slings, hoist lines, etc. are to be considered part of the load.

A load chart cannot always be relied on to set limits for every possible
configuration of a crane. Therefore, when no specifically applicable limits are included
on a load chart, the employer is expected to make a reasonable estimate of the limits of
the crane from the capacities set forth in the load chart. See Towne Construction Co.
v.OSHRC , 847 F.2d 1087 (6th Cir. 1988).

The standard requires that when no load specifications are available, the limitations
shall be determined by a competent engineer. [[5/]] Although not qualified at the hearing
as "competent engineers," the CEI operators who were most familiar with the
crane repeatedly warned that the load exceeded the crane's capacity. These warnings put
Respondent on notice that, if it were going to make the lift, it had to take effective
steps to determine with certainty if the weight was within the crane's capacity.

Although the evidence does not establish the precise capacity of the crane, we find
that the evidence overwhelmingly establishes that the load exceeded the manufacturer's
specifications and limitations in violation of � 1926.550(a)(1). The evidence established
that: the maximum listed capacity for the crane with a 40-foot jib is 14,000 pounds; all
reasonable estimates of the weight of the load were substantially in excess of 14,000
pounds; no competent engineers were assigned to determine whether the crane was capable of
lifting a load in excess of 14,000 pounds; CEI operators repeatedly warned that the load
exceeded the capacity of the crane; the Secretary's crane expert testified that the load
exceeded the crane's capacity; and when the lift was made, the crane collapsed.

C.

Respondent next argues that the citation should be
dismissed because the lift was the result of unpreventable supervisory misconduct on the
part of its foreman, Tom Link. Respondent contends that the evidence demonstrates that
CEI's Lothian told Payne that the Manitowac 4000 crane could make the lift if it was
rerigged and that Payne subsequently ordered Link not to make the lift until the crane
could be rerigged. In authorizing the lift, Respondent contends that Link directly
disobeyed Project Manager Payne's order not to make the lift until the crane was rerigged,
for which he was terminated. Respondent contends that, by discrediting Payne's account on
the basis that he found it "highly unlikely that Link would have ordered the lift in
contravention of instructions from Payne and against the advice of all crane
operators," the judge substituted his own subjective belief for the undisputed record
evidence that Link was insubordinate. Respondent also argues that the judge's conclusion
that other Joint Venture supervisors were aware that the lift was being made, yet did
nothing to stop it, is not supported by the record.

The Commission is normally reluctant to disturb a
judge's credibility finding. Kent Nowlin Construction Company, Inc., 8 BNA OSHC
1286, 1980 CCH OSHD � 24,459 (No. 76-191 and 76-192, 1980); Otis Elevator Co ., 8
BNA OSHC 1019, 1980 CCH OSHD � 24,236 (No. 14899, 1980), appeal withdrawn , No.
80-470 (2d Cir. May 15, 1980); C. Kaufman, Inc ., 6 BNA OSHC 1295, 1977-78 CCH OSHD
� 22,481 (No. 14281, 1977), This deference is granted because it is the judge who has had
heard the witnesses and observed their demeanor. C. Kaufman, Inc. , 6 BNA OSHC at
1297, 1977-78 CCH OSHD at pp. 27,099. Here, however, the judge did not make the type of
credibility finding to which we ordinarily defer. It was not based on the traditional
weighing of conflicting testimony, but rather on his subjective assessment of the
probability of events. Indeed, there was no evidence to contradict Payne's testimony that
he ordered Link not to make the lift.

However, even accepting at face value Payne's
testimony regarding his orders to Link, the overwhelming weight of the evidence still
supports the testimony of CEI's manager in Tampa, Lothian, that he told Payne that the
crane could not make the lift and that the Manitowac 3900 should be used. The evidence is
also clear that Payne was anxious to make the lift and did not want to take the time to
move the Manitowac 3900 crane and prepare it for the lift. According to Lothian, Payne was
very agitated when he spoke to him about the unwillingness of CEI's operators to pick up
the stairwell form. Even after Lothian explained that the weight of the stairwell was
above the limit of the crane, Payne argued for the lift on the grounds that the stairwell
was "only" 1300 pounds above the limit. When told that there was a crane at the
worksite capable of handling the load, Payne told Lothian that getting the other crane
ready was a lot of work "for one lousy pick." We therefore find that the
evidence establishes that Payne knew that his decision to make the lift with a rerigged
Manitowac 4000 crane was contrary to the express warnings conveyed to him and his
supervisors by Lothian and the CEI operators.

Moreover, even though Payne instructed Link not to
make the lift until the crane was rerigged, the evidence established that the load would
still have exceeded the capacity of the crane, even if the crane were rerigged. Although
rerigging the crane might have increased the capacity of the crane, Respondent was amply
informed by the CEI operators of their concern that, even after being rerigged, the crane
was not capable of making the lift and that another crane was available at the site that
could safely make the lift. An unpreventable misconduct defense will not be established
where the employer's instructions were insufficient to eliminate the hazard even if the
employee had complied with those instructions. Brown and Root, Inc. , 8 BNA OSHC
1055, 1060, 1980 CCH OSHD � 24,275 at p. 29,570 (No.76-3942, 1980); See also Eddy's
Bakeries Company , 9 BNA 2147, 2151, 1981 BNA OSHC � 25,604 at pp. 31,940 (No.
77-1084, 1981) (Workrule that fails to abate hazard, even when adequately implemented,
does not fulfill employer's duty under section 5(a) (1)). Here, Link disobeyed a direct
order, but the order itself required a violation of the standard.

Even if Payne had believed that the Manitowac 4000
crane could successfully make the lift, Link's disobedience would still not relieve the
Joint Venture of responsibility for the overweight lift. When an employer raises the
affirmative defense of unpreventable employee misconduct, the employer must demonstrate
that the actions of the employee were a departure from a uniformly and effectively
communicated and enforced workrule. When the alleged misconduct is that of a supervisory
employee, the employer must also establish that it took all feasible steps to prevent the
accident, including adequate instruction and supervision of its employee. Daniel
International Co. v. OSHRC, 683 F.2d 361, 364 (11th Cir., 1982); Daniel
Construction Co. , 10 BNA OSHC 1549, 1552, 1982 CCH OSHD � 26,027 at pp. 32,672 (No.
16265, 1982). Where a supervisory employee is involved, the proof of unpreventable
employee misconduct is more rigorous and the defense is more difficult to establish since
it is the supervisor's duty to protect the safety of employees under his supervision. Id.
A supervisor's involvement in the misconduct is strong evidence that the employer's safety
program was lax. Id Here, Link's involvement in the lift was consistent with Payne's
strong interest in having the lift made.

In addition, we agree with the judge's finding that
other supervisory personnel allowed the lift to be made despite their knowledge that the
load exceeded the crane's capacity. The evidence establishes that the lift was made in
full view of Respondent's Safety Director Ford. Ford was not involved in the decision
regarding the use of the crane, but he had previously been informed by CEI crane operator
Shurtleff that the Burke form was too heavy a load for the crane. Moreover, assuming, arguendo ,
that Ford was not aware of the dispute over the lift, the failure of the safety official
on the site to be informed and consulted about the dispute over the safety of the lift
strongly suggests that the Joint Venture failed to implement a safety program that
emphasized the importance and priority of safety. We therefore conclude that Respondent
failed to establish the affirmative defense of unpreventable employee misconduct.

D.

The Joint Venture next argues that it should not be
held liable for any violation involving the operation of the crane because it was entitled
to rely on the expertise of CEI when deciding whether to make the lift. It claims that
under the rental agreement, CEI was to provide a "qualified operator,"
"operate the equipment in a professional and safe manner" and "be the sole
operator of this equipment." The Joint-Venture contends that it was the
responsibility of the crane operator to operate the crane in a safe manner and to ensure
that the crane was not overloaded. Respondent claims that the judge erred by not
considering the lease agreement, the history of negotiation it had with CEI and CEI's own
policy of holding its operators responsible for crane safety. Respondent further submits
that CEI lead operator Walters authorized the lift after operator Dickey refused to make
the lift and other CEI operators agreed that it should not be made. Finally, Respondent
argues that the judge erred by excluding proffered testimony establishing that the lift
was authorized by a CEI supervisor in Tampa.

Respondent's arguments are without merit. When an
employer contracts with a specialist, the employer is justified in relying upon the
specialist to protect against hazards related to the specialist's expertise, as long as
the reliance is reasonable and the employer has no reason to foresee that the work will be
performed unsafely. Sasser Electric & Manufacturing Co ., 11 BNA OSHC 2133,
1984-85 CCH OSHD � 26,982 (No. 82-178, 1984), aff'd, No. 84-1961 (4th Cir. 1985).

Sasser does not support Respondent's
contention that it should not be held liable for the unsafe lift. Having hired CEI to
operate the cranes, the Joint Venture could have properly relied upon the CEI operators to
determine when a load exceeded the capacity of the crane and not to exceed those limits.
Here, however, the Joint Venture obviously exerted pressure on the operators to ignore
their judgment and raise a load that they had warned exceeded the crane's limits.
Respondent did not rely on the expertise of the crane operator. Instead, it ignored and
tried to countermand it. Rather than showing that it could not have foreseen that the work
would be performed in an unsafe manner, the evidence establishes that the Joint Venture
was fully aware that the lift was unsafe and that it actually insisted that the lift be
made despite the hazard. Given these facts, the allocation of responsibility under the
contract has no real relevance. Regardless of CEI's contractual responsibilities, the
critical fact is that the Joint Venture prevailed upon the operator to ignore his best
judgment and proceed with the lift.[[6/]]

Having found no merit in any of Respondent's defenses
to the alleged violation, we find that the Secretary established that the Joint Venture
violated 29 C.F.R. �1926.550(a)(1).

E.

Finally, the Joint Venture argues that the Judge
erred by affirming the violation as willful. According to Respondent, orders given to Link
not to authorize the lift until the crane was rerigged establishes that the Joint Venture
was concerned with employee safety.

To establish that a violation was willful, the
Secretary must prove that the violation was committed with intentional disregard of the
Act's requirements or plain indifference to worker's safety. R.D. Anderson Construction
Co., 12 BNA OSHC 1665, 1669, 1986-87 CCH OSHD � 27,500 at pp. 35,641 (No. 81-1469,
1986); D.A.L. Caruso, Inc., 11 BNA OSHC 2138, 1984 CCH OSHD � 26,985 (No. 79-5676,
1984).

We find that the record supports the ALJ's conclusion
that the Joint Venture intentionally disregarded the requirement that lifts not exceed a
crane's capacity and that it was indifferent to employee safety. Both Payne and Link
expressed considerable displeasure and frustration over the operator's refusal to make the
lift. Despite numerous warnings by the operator that the load exceeded the capacity of the
crane, Payne and Link made repeated demands on the CEI operators to make the lift. Even
when informed by CEI manager Lothian that the lift could be made safely by another crane
elsewhere on the site, Payne's concern was that preparing a new crane was a lot of effort
for "one lousy lift." The lift was finally made when Link, contrary to what he
plainly knew to be the facts, wrote and signed a "release" falsely attesting
that the weight of the form was within the crane's capacity.

Respondent would have us view Payne's order to Link
not to make the lift until the crane was rerigged as a good faith effort at compliance. In
certain cases, we found that a willful charge is not justified if an employer has made
such efforts to comply with a standard or to eliminate a hazard even though the employer's
efforts are not entirely effective or complete. Keco Industries, Inc .,13 BNA OSHC
1161, 1169, 1986-87 CCH OSHD � 27,860 at pp. 36,478 (No. 81-263, 1987). Here, however, we
find that Payne's directive to Link did not constitute a good faith effort to comply with
the Act. Payne had been repeatedly warned that the crane was not capable of lifting the
form, and was specifically told by Lothian that, even after rerigging, the crane could not
handle the load. Accordingly, we affirm the judge's finding that the violation was
willful.[[7/]]

At the hearing Respondent stipulated that if a
violation were found, the penalty proposed by the Secretary was appropriate. Accordingly,
we affirm the judge's assessment of the $10,000 proposed penalty.

Adequacy of Respondent's Safety Program-29 C.F.R.
� 1926.21(b)(2) [[8/]]

Respondent was issued a citation alleging a serious
violation of 29 C.F.R. � 1926.21(b)(2) on the grounds that it failed to provide safety
training or instruction to its West Palm Beach employees in several areas of crane safety.
The citation alleged that Respondent failed to instruct employees in:

a. Proper hand, flag and radio signaling of cranes;

b. How to properly rig a crane, including calculation of weight, types and components of
rigging, and designation of a competent person to be in charge of critical lifts; and

c. Understanding manufacturer's specifications for proper use of cranes including maximum
loads at various configurations.

The judge affirmed the violation and assessed a
$1,000 penalty. We reverse the judge and vacate the item.

The evidence establishes that the Joint Venture held
safety meetings approximately once a week. The meetings were not held on any regular
schedule. Rather, safety director Ford would contact the foreman who would set up a time,
usually during a break. The meetings would last approximately 15 minutes. At these
meetings, which were usually led by safety director Ford, the employees would discuss
various problems. Crane safety was among the subjects discussed, and included such topics
as flying loads over people's heads, use of the horn, and signaling. Weekly safety meeting
reports for the period between October 10, 1986 and the collapse on April 28, 1987 show
that aspects of crane safety were frequently discussed. Although he conducted the majority
of the safety meetings, Ford admitted that he was not involved with either crane
operations or the rigging on the cranes. In addition, Ford testified that, before becoming
the safety official for the Joint Venture, his safety training had consisted of a
correspondence course and on the job training. Another significant component of Ford's
safety training was his reading of the OSHA Handbook and brochures.

OSHA compliance officer Corey Neale was qualified by
the judge as an expert on cranes. Based on employee interviews and observations during the
walkaround, Neale concluded that the Joint Venture's employees were not properly trained
in crane safety. Among those interviewed was foreman David Stuart, who was fired after the
accident. Stuart told Neale that he never had any training in rigging and that the Joint
Venture never held any classes explaining signaling, flagging, working loads or which
types of chokers to use. Employees who worked on the day of the collapse also told Neale
that they never received any training in rigging or hand signals. Regarding rigging, Neale
testified that the employees told him that "You just watch somebody and you go out
and you do it." In addition, the employees told him that they tried to get a foreman
to give the signals when one was available.

Foreman Stuart testified that Ford occasionally
passed out safety sheets for employees to read, sign and return, but he could not recall
attending safety meetings. Although Stuart testified that he did not attend any safety
meetings in April of 1987, he could not explain why his signature appeared on the safety
meeting minutes of April 17 and 24.

Jerry Freeman, a crane operator with 31 years
experience, who worked for CEI at the Palm Beach Airport Project from December 1986 to
April 1987, testified that Archer-Western employees provided the hooking or rigging on the
loads and that they did a good job. According to Freeman, the employees followed
directions well. He testified that he was very particular about his rigging, and that the
Joint Venture employees were able to rig his crane the way he wanted. In addition, Freeman
testified that the Joint Venture provided very good signalmen and that he never had any
problems in that regard. CEI crane operator Shurtleff also testified that he was supplied
with adequate signalmen.

Although the judge found that the Joint Venture held
regular safety meetings, he concluded that the evidence established that the training was
inadequate. The judge found the safety training in rigging and crane operation inadequate
based on the "ample" record of safety violations committed by the Joint
Venture's employees. Of particular importance was "the ease with which the
supervisory personnel committed or condoned the violations; they participated in the lift
knowing the weight was excessive, and they were aware that their employees were riding the
loads." He concluded that the benefit of any safety training given by Respondent was
nullified by the failure of supervisory personnel to either enforce it, or follow it
themselves.

Respondent argues that the judge ignored testimony
that established that its safety sessions provided employees with extensive training on
crane safety, signaling and rigging. It also claims that the judge's finding was contrary
to the testimony of CEI's crane operator's that the rigging and signaling were adequate.

The Secretary contends that Respondent's lack of
safety training regarding rigging and crane operations establishes the violation. The
Secretary notes that even though Respondent had five large cranes at the worksite, it
could not produce any employees at the hearing who were knowledgeable in the rigging and
operation of cranes. Interviews with employees confirmed that they knew little or nothing
about rigging and crane procedures.

The duties imposed by 29 C.F.R. � 1926.21(b)(2) are
satisfied when the employer instructs its employees about the hazards they may encounter
on the job and about the regulations applicable to those hazards. Dravo Engineers and
Constructors , 11 BNA 2010, 2011-2, 1984-85 CCH OSHD � 26,930 (No. 81-748, 1984); Sawnee
Electric Membership Corporation , 5 BNA 1059, 1977-78 CCH OSHD � 21,560 (No. 10277,
1977). The evidence establishes that the Joint-Venture held regular safety meetings and
that at those meetings some aspects of crane safety were discussed. Most of the
discussions of crane safety, however, were concerned with the hazards of swinging loads
over the heads of employees. According to these minutes, only minimal attention was paid
to rigging, signaling, or the importance of observing manufacturer's specifications.
Moreover, the meetings were conducted by safety director Ford, who had minimal safety
qualifications in general and virtually none regarding cranes.

While the minutes did not establish that employees
were adequately trained in all phases of crane operations, the uncontested testimony of
CEI operators Freeman and Shurtleff established that Respondent's employees were, in fact,
adequately trained in signaling and rigging. The most damaging evidence against Respondent
was given by former foreman Stuart. However, because Stuart's employment was terminated by
Respondent and he could not remember attending safety meetings for which he signed the
minutes, the weight of his testimony must be considered diminished. Therefore, although
the meeting minutes did not show that Respondent's employees received significant
training, the performance of those employees establishes that they were trained in rigging
and signaling.

The Secretary also alleged that the employees were
not trained in understanding manufacturer's specifications for proper use of cranes
including the lifting of maximum loads at various configurations. The record establishes,
however, that Respondent relied on the crane operators, employees of CEI, to determine the
load capacities of the cranes. Although Respondent has a duty to its own employees, even
when it relies on a specialist such as CEI, see Sasser Electric & Manufacturing
Co., 11 BNA at 2136, 1984-85 CCH OSHD at p. 34,684, we cannot fault Respondent for
failing to instruct its employees in matters that fall within the expertise of CEI's crane
operators, when it reasonably relies on that expertise. Id.

Contrary to the judge's finding, the insistence by
Respondent's supervisory personnel that the stairway form be lifted, while indicative of a
general disregard for employee safety, was not the result of a lack of training in the
determination of crane capacities. Respondent's supervisors were adequately warned that
the crane lacked the proper capacity by the CEI operators, whose job it was to make such
determinations. We therefore conclude that the Secretary failed to establish that
Respondent violated 29 C.F.R. � 1926.21(b)(2).

Accordingly, the judge's finding of a willful
violation of 29 C.F.R. � 1926.550(a)(1) is affirmed and a $10,000 penalty is assessed.
The judge's finding of a serious violation of 29 C.F.R. � 1926.21(b)(2) is reversed and
the item is vacated.

Edwin G. Foulke, Jr.

Chairman

Donald G. Wiseman

Commissioner

Dated: April 30, 1991

SECRETARY OF LABOR,

Complainant,

v.

ARCHER-WESTERN CONTRACTORS,

LTD., and GILBERT

CORPORATION OF DELAWARE,

INC., A Joint Venture,

Respondent.

OSHRC Docket No. 87-1067

APPEARANCES:

Stephen Alan Clark, Esquire, Office of the Solicitor,
U. S. Department of Labor, Fort Lauderdale, Florida, on behalf of complainant.

James E. Moye, Esquire, Hansell and Post, Atlanta, Georgia, and John O'Rourke,
Esquire, O'Brien, O'Rourke, Hogan and McNulty, Chicago, Illinois, on behalf of

respondent.

DECISION AND ORDER

SPARKS, Judge: Respondent, Archer-Western
Contractors, Limited, and Gilbert Corporation of Delaware, Incorporated, a Joint Venture,
("Joint Venture") is the prime contractor for the construction of the new
airport terminal at West Palm Beach, Florida. It contests two citations issued to it by
the Secretary of Labor on June 25, 1987, under the Occupational Safety and Health Act of
1970 ("Act"), following a crane accident at the project. Citation Number One is
a two-item serious citation for the violation of 29 C.F.R. � 1926.21(b)(2) for failure to
instruct employees in the recognition and avoidance of unsafe conditions, and 29 C.F.R. �
1926.550(a)(9) for failure to barricade the swing radii of various cranes' rotating
superstructures. [[1]] Citation Number Two is a three-item willful citation for the
violation of 29 C.F.R. � 1926.251(c)(1) for using inadequate rigging, 29 C.F.R. �
1926.550(a) for exceeding the lift capacity of a crane, and 29 C.F.R. � 1926.550(b)(2)
for allowing employees to ride the loads of cranes.

The parties stipulated at the hearing that, if Joint
Venture were found to be in violation of any of the items of the serious citation, the
penalty for each item would be in the amount proposed in the Secretary's citation. The
parties further stipulated that, if Joint Venture were found in violation of any of the
items of the willful citation, the penalty for each item would be $10,000. If a willful
violation were reduced to a serious violation, the penalty would be $1,000 for each item
(Tr. 566-567).

At the beginning of the hearing, the Secretary
offered into evidence the depositions of Michael Lothian (Ex. C-1; Tr. 43), Roger Weir
(Ex. C-2; Tr. 44), Rodney Walters (Ex. C-3; Tr. 45), and John McDonald, Jr. (Ex. C-4; Tr.
47). It was ruled that evidence relating to events occurring after April 28, 1987, (other
than observations made by the OSHA Compliance Officer during his May inspection) would be
inadmissible (Tr. 37). Accordingly, the parties were permitted to withdraw the depositions
and delete that testimony pertaining to events occurring subsequent to April 28. After the
hearing, the parties submitted each deposition in two volumes: the first volume containing
the testimony to be received into evidence and the second volume containing proffered
testimony relating to post-April 28 events. The parties also submitted portions of the
depositions that were objected to on other grounds. Those portions are hereby admitted
into evidence.

FACTS

Joint Venture is a partnership formed by
Archer-Western Contractors, Limited, and Gilbert Corporation of Delaware, Incorporated,
for the airport terminal project. Archer-Western owns a 60 percent controlling interest in
the partnership and is the managing partner (Ex. C-9, deposition pp. 12, 43; C-9 Exhibit
1).

The instant case arises from Joint Venture's contract
to construct a terminal at the international airport in West Palm Beach, Florida. The work
site was on 30 to 40 acres of land. The buildings would cover approximately 1,500,000
square feet.

The plans called for a three-story terminal with four levels of parking above it, and
three concourses (Tr. 845).

For the project, Joint Venture decided against using
its own cranes and employees as crane operators. Instead, Joint Venture contracted with
Construction Equipment International, Inc., ("CEI") to provide cranes and crane
operators (Tr. 396-398). On January 20, 1987, a written agreement encompassing the
equipment lease between Joint Venture and CEI was signed. The lease provides in pertinent
part: "Lessor and its employee/operator will be sole operator of this equipment, and
all such operations are under Lessee's exclusive jurisdiction, supervision, and
control" (Ex. R-13). Under the agreement, CEI supplied Joint Venture with five
cranes: two Manitowoc 4000-W cranes, a Manitowoc 3900 conventional crane, and two Tadano
hydraulic cranes. CEI did not provide rigging, riggers or signalmen (Tr. 396-398, 371).

On April 28, 1987, Joint Venture instructed CEI that
it needed the Burke form lifted from stairwell number four (Tr. 304). The Burke form is a
core form used for the stairwell. It measures 15 by 27 feet and can reach a maximum height
of 14 feet (Tr. 53). The Burke form at stairwell four was nine feet high (Tr. 66).

CEI operator James Earl Dickey was operating a
Manitowoc 4000-W crane, which is a 150-ton crane with a 133-foot tower, 160 feet of
working boom, and a 40-foot jib (Tr. 132, 660). A lifting beam was hooked to the crane and
the beam was then hooked to the Burke form. Laborers worked with crowbars and a
sledgehammer to loosen the form from the stairwell (Tr. 319). As Dickey applied pressure
to lift the form, the boom of the crane collapsed (Tr. 324).

OSHA Compliance Officer Corey Neale arrived at the
work site on May 5, 1987, to conduct an investigation of the collapse (Tr. 488). When he
arrived, the collapsed tower crane had been removed (Tr. 492). As a result of Neale's
investigation, Joint Venture was cited for several safety violations.

I

WILLFUL CITATION TWO, ITEM ONE

EXCEEDING THE RIGGING CAPACITY

Item One, Willful Citation Two,[[2]] charges
respondent with violating 29 C.F.R. � 1926.251(c)(1) which provides as follows:

Tables H-3 through H-14 shall be used to determine the safe working loads of various
sizes and classifications of improved plow steel wire rope and wire rope slings with
various types of terminals. For sizes, classifications, and grades not included in these
tables, the safe working load recommended by the manufacturer for specific, identifiable
products shall be followed, provided that a safety factor of not less than 5 is
maintained.

The Secretary's witness, Dennis O'Rourke of National
Crane Services, was qualified as an expert in safety with specialization in cranes and
rigging (Tr. 169, 172). O'Rourke stated that the upper slings used to connect the crane
hook to the lifting beam should have been one inch in diameter in order to comply with the
standard (Tr. 190). Joint Venture's expert, Don Markwardt, calculated that a 7/8-inch
diameter wire rope sling would comply with the standard (Tr. 760-769). The Secretary
contends Joint Venture violated � 1926.251(c)(1) by using a sling that was 5/8-inch in
diameter. The Secretary failed to prove this fact at the hearing.

Of the witnesses who testified regarding the rigging,
none of them could say with certainty what the diameter of the sling rope was. CEI
operator Shurtleff testified he had no idea what size rope was used for the lift (Tr.
161). Joint Venture foreman David Stuart testified he was uncertain of the diameter of the
spreaders used to make the lift (Tr. 311).

The only witness who actually measured the spreaders,
Corey Neale, gave contradictory testimony. At the hearing, Neale stated the spreader was
fiber core, not wire core. In his deposition, he stated it was independent wire rope
(IWRC) (Tr. 598). The citation stated it was IWRC (Tr. 599). At the hearing, Neale stated
the spreader was swaged (Tr. 500). In his deposition, he stated it was manufacture spliced
(Tr. 600) Neale initially stated in his deposition that the spreader above the beam was
7/8 inch in diameter (Tr. 595). At the hearing, he was certain that the spreader was
5/8-inch diameter (Tr. 593).

Neale stated he only measured one of the three
spreaders and that one spreader measured 5/8 inch in diameter. Because they "all
looked the same," he did not measure the other spreaders (Tr. 593-594). It is
undisputed that 7/8-inch slings were available on the work site (Tr. 160). In sum, the
Secretary failed to prove by a preponderance of the evidence that Joint Venture was using
inadequate rigging.

WILLFUL CITATION TWO, ITEM TWO

EXCEEDING THE BOOM CAPACITY

Item Two, Willful Citation Two, [[3]] charges
respondent with violating 29 C.F.R. � 1926.550(a)(1) which provides as follows:

The employer shall comply with the manufacturer's specifications and limitations
applicable to the operation of any and all cranes and derricks. Where manufacturer's
specifications are not available, the limitations assigned to the equipment shall be based
on the determination of a qualified engineer competent in this field and such
determinations will be appropriately documented and recorded. Attachments used with cranes
shall not exceed the capacity, rating, or scope recommended by the manufacturer.

It is undisputed that the maximum lifting capacity of
the Manitowac boom was 14,000 pounds (Ex. C-1, Lothian deposition Vol. II, p. 40; C-3,
Walters deposition p. 95; Tr. 178, 179-182). The evidence clearly establishes that the
weight of the load lifted was at least 20,000 pounds. Henry Siegel, the district manager
of Burke Company, calculated the weight of the Burke form to be approximately 20,000
pounds (Tr. 55). CEI operator Walter Shurtleff lifted the form after the collapse with his
Tadano 45-ton crane, which was equipped with a load cell that enabled it to weigh loads.
He and Michael Lothian, CEI's regional manager, calculated the form to weigh 20,000 pounds
(Tr. 84-85).

Although the events leading up to the boom collapse
are in some dispute, the most credible testimony established the following:

Ed Payne was the project manager for Joint Venture at
the West Palm Beach work site (Tr. 361). Prior to April 28, Payne had understood the
weight of the Burke form to be between 12,000 and 14,000 pounds (Tr. 375).

David Stuart was the carpenter foreman for Joint
Venture at the time of the collapse (Tr. 294). He testified that on April 28, Joint
Venture superintendent Tom Link instructed him to raise the form on stairwell four.[[4]]
Stuart asked CEI operator Dickey to make the lift (Tr. 306). Dickey initially refused to
make the lift because he thought the form exceeded his crane's capacity. Stuart informed
CEI's lead operator Rodney Walters that Dickey refused to make the lift (Tr. 307). Stuart
also informed Payne and Joint Venture engineer Joseph Appleton that Dickey would not make
the lift. Appleton then calculated the weight of the Burke form to be 17,000 pounds. Payne
than stated, "They've made that lift before, and we have to have that form lifted
today. It's important that we get it done" (Tr. 309).

Payne called CEI's Michael Lothian in Tampa and
asked, "What the hell is the matter with your guys? What is this shit about your guys
not picking this form?" (Ex. C-1, deposition Vol. II, pp. 182-183). Lothian told
Payne that the form was in excess of the crane's capacity. Lothian pointed out that there
was another crane on the work site capable of handling the pick (Ex. C-1, deposition Vol.
II, pp. 39-40).

About 2:00 that afternoon, Stuart accompanied Tom
Link to see Rodney Walters about the lift. Stuart testified regarding the meeting (Tr.
315-317):

The head operator (Walters) explained that he wasn't
going to make the lift or tell that man (Dickey) to make the lift until he had authority
from his supervisors. He suggested, however, that there was an out. That's exactly what he
said--that there was an "out"--if Archer chose to exercise it. . . . He said if
Archer would sign a waiver or a release of liability, that they would go ahead and make
the lift. . . . Tom Link said, "Is that all I have to do?" Then, he grabbed a
three by five notepad out of my pocket and my pen, and he wrote on it, "This form
weighs," something or other, but it was well under the limit. I think he wrote
"12,000 pounds" on it is what I saw. Then, I saw him sign it, and he handed it
and he said, "Here is your release. Go ahead and make the lift."

In fact, what Link wrote was (Ex. C-3, Exhibit B):

STAIR #4

12,000 pds.

T. Link

Joint Venture's safety official, Burt Ford, was told
by Dickey that no one should ride the form while he was making the lift (Tr. 905).
(Laborers working to loosen the form from the stairwell walls would sometimes stand on the
form while doing so [Tr. 302]). Ford instructed Stuart not to let anyone ride the form
(Tr. 407). Two Joint Venture carpenters refused to work on the form while the lift was
being made (Tr. 284, 318). As Dickey attempted to lift the form, the boom collapsed.

Regarding the duty of the general contractor on a
multi employer work site, the Review Commission in Grossman Steel & Aluminum Corp.,
76 OSAHRC 54/D9, 4 BNA OSHC 1185, 1188, 1975-1976 CCH OSHD � 20,691 (No. 12775, 1975),
held as follows:

.  .  .the general contractor normally has
responsibility to assure that the other contractors fulfill their obligations with respect
to employee safety which affect the entire site. The general contractor is well situated
to obtain abatement of hazards, either through its own resources or through its
supervisory role with respect to other contractors. It is therefore reasonable to expect
the general contractor to assure compliance with the standards insofar as all employees on
the site are affected. Thus, we will hold the general contractor responsible for
violations it could reasonably have been expected to prevent or abate by reason of its
supervisory capacity.

Therefore, respondent as general contractor may be
held responsible for the hazardous conditions due to its "supervisory capacity."
Moreover, in this case, based upon the findings of creditable evidence, Joint Venture is
responsible because it created and controlled the hazard found in violation of the Act. Red
Lobster Inns of America, Inc, 80 OSAHRC 73/A14, 8 BNA OSHC 1762, 1980 CCH OSHD �
24,635 (No. 76-4754, 1980).

Joint Venture's overriding argument is that all of the alleged violations are
crane-related, it relied upon the expertise of the crane operator, and thus CEI, and not
Joint Venture, bears the responsibility for any violation. Respondent relies upon Sasser
Service, Division of Sasser Electric Co., 84 OSAHRC 37/C6, 11 BNA OSHC 2133, 1984-1985
CCH OSHD � 26,982 (No. 82-178, 1984) Current Builders, Inc., 84 OSAHRC 15/C7, 11
BNA OSHC 1949, 1984-1985 CCH OSHD � 26,888 (No. 83-994, 1984), and other similar cases
(respondent's brief pp. 19-22) which absolve the contractor of responsibility for the
violative conditions caused by a leased crane and operator when the lessor has relied upon
the expertise of the crane operator. The cases are inapposite to the instant case,
however, because Joint venture did not rely on the expertise of CEI and the crane
operator; but, contrary to their advice, insisted that the overweight lift be made. Joint
Venture's managers supervised the lift knowing that the weight of the Burke form exceeded
the capacity of the crane. Respondent, therefore, created and controlled and was directly
responsible for the violation.[[5]] Red Lobster Inns of America, Inc ., supra .
In making this argument, Joint Venture ignores the degree to which it controlled and
supervised the operation of the cranes. The contract between the companies gave Joint
Venture "exclusive jurisdiction, supervision, and control" of the crane
operations, and the record demonstrates that Joint Venture fully exercised its contractual
rights.

Dickey was a reluctant operator ordered against his
better judgment to make a lift he and everyone else knew was unsafe. When Lothian informed
Payne that the form exceeded the crane's capacity, Joint Venture's project manager
retorted that the form was "only" 1,300 pounds over its capacity (Ex. C-1
deposition Vol. II, p. 40).

Joint Venture also claims unpreventable supervisory
misconduct on the part of Superintendent Tom Link in authorizing the lift, but the
creditable evidence of record does not establish that defense. Moreover, while it is true
Link gave written authorization for the lift, other Joint venture supervisors were aware
the lift was being made, and did nothing to stop it. Foreman Stuart, who witnessed the
"out" offered by Walters, actually signaled Dickey to bring the form up as it
was pried loose from the stairwell walls (Tr. 324). Ford, who was in charge of safety for
Joint Venture, was told by Dickey that the lift was not safe. Ford's only action was to
agree to tell his employees not to ride the form during the lift. Project Manager Payne,
when told the lift exceeded the crane's capacity, did not halt the lift but instead
insisted the lift had to be made that day and placed an angry phone call to Lothian.[[6]]

The record supports the conclusion that there was a concerted effort on the part of Joint
Venture's supervisory personnel to get the lift made on April 28 despite their specific
knowledge that the form exceeded the crane's capacity in violation of 29 C.F.R. �
1926.550(a)(1).

The Secretary alleges that the violation was willful.
"A violation is willful if it was committed voluntarily with either an intentional
disregard for the requirements of the Act or with plain indifference to employee
safety." A. C. Dellovade. Inc ., OSAHRC, 13 BNA OSHC 1017, 1987 CCH OSHD
� 27,786, p. 36,341 (No. 83-1189, 1987).

As further evidence of the willful nature of the
violation alleged in Citation Number Two, Item Two, the Secretary offered evidence of
Archer-Western's previous experience with cranes. In 1986 and 1987, Archer-Western had
several projects underway in south Florida (Ex. C-9, deposition p. 17). Among these
projects was the Sunny Isles Bascule Bridge in North Miami Beach. Archer-Western was hired
to remove an existing bridge and to construct a pair of bascule bridges over the
intercostal waterway (Tr. 822). At the start of the project, Archer-Western owned two
small hydraulic cranes and purchased three more cranes. Archer-Western hired its own crane
operators (Tr. 823-824).

On December 2, 1986, Daniel Newburn, an employee of Archer-Western, was helping a crane
operator to unload machinery from a truck. Newburn was on the around unhitching the crane
cables when the operator moved too close to an energized power line. Electricity arced
from the power line to the crane cable, and down the crane cable to the crane hook that
Newburn was holding. Newburn died by electrocution (Ex. C-9, deposition p. 23; C-9
exhibits 5, 10). The fatality prompted an OSHA investigation by Compliance Officer John
McDonald, Jr., that resulted in three citations (Ex. C-4; Tr. 7).

Joint Venture manifested an intentional disregard for
the requirements of the Act in this instance. As previously stated above, after being
specifically informed several times the load was in excess of the manufacturer's
specifications, Joint Venture insisted that the lift be made that day. The facts were
clearly presented to management and it intentionally and voluntarily chose to disregard
the obvious hazard to its employees. From its previous experience on the Sunny Isles
Project, Archer-Western was well aware of the hazards presented by crane operations. As
managing partner of the joint venture, such knowledge is imputed to respondent; but, even
without the previous experience at Sunny Isles, the record shows that the management of
Joint Venture intentionally, voluntarily, and with full knowledge that the weight of the
Burke form exceeded the capacity of the crane, insisted that the lift be made.
Accordingly, Joint Venture subjugated employee safety in the interests of expediency.
Joint Venture was in willful violation of 29 C.F.R. � 1926.550(a)(1). Georgia Electric
Co. v. Marshall , 595 F.2d 309 (5th Cir. 1979).

WILLFUL CITATION TWO, ITEM THREE

TRANSPORTING PERSONNEL ON CRANES

Item Three, Willful Citation Two,[[7]] charges
respondent with violating 29 C.F.R. � 1926.550(b)(2) which provides as follows:

All crawler, truck, or locomotive cranes in use shall
meet the applicable requirements for design, inspection, construction, testing,
maintenance and operation as prescribed in the ANSI B30.5-1968, Safety Code for Crawler,
Locomotive and Truck Cranes.

ANSI B30.5-1968, � 5-3.2.3-e states that, "the
operator shall not hoist, lower, swing, or travel while anyone is on the load or
hook."

The cranes at the work site were used to lift concrete buckets for pouring columns. It is
undisputed that one of the buckets was modified with a platform attachment which enabled a
worker to ride with the bucket (Tr. 340-341). Payne and Ford were both aware of the
bucket's use (Tr. 45, 700). The bucket had been modified by Rodney Walters, the CEI
foreman (Tr. 152-153, 451).

Neale testified that, based on employee interviews,
he determined that employees sometimes rode the Burke forms (Tr. 559-562). Stuart
testified that, while workers were prying loose the forms from the walls, they would stand
on the forms. When the form would break loose, the form would rise four to six feet due to
the cable tension, then settle back down. The worker would ride the form as it rose and
lowered (Tr. 302).

Joint Venture argues that the ANSI standard is
directed at the crane operator and not at the employees riding the loads. In support of
this argument, Joint Venture cites Havens Steel Co ., 78 OSAHRC 53/C11, 6 BNA OSHC
1740, 1978 CCH OSHD � 20,775 (No. 15538, 1978). In Havens , two construction
workers rode "on a headache ball at the end of a hoisting rope of a Link- Belt crane
used and controlled by Havens. Inasmuch as Havens clearly controlled the crane, however,
it was under a duty to operate the crane in conformity with the standards even if such
compliance would have protected only employees of the contractor at this multiple-employee
construction worksite." (Id. at 1741). This case does not help Joint Venture. Like
Havens, Joint Venture used and controlled the CEI cranes.

Joint Venture also advances an infeasibility defense
with regard to men riding the concrete bucket. Joint Venture bases this defense on Payne's
testimony that the concrete columns could not be poured unless an employee was allowed to
ride with the bucket because "you have to be opening the bucket and closing it so
that the concrete doesn't come back up in elephant trunk and close up and then you get
buried in the concrete and you can't get it out" (Tr. 703). Payne's testimony is not
sufficient to establish infeasibility. Payne testified that he never watched the operation
of the crane. He generally performed his duties in his office in the trailer compound (Tr.
367-369). His testimony standing alone is insufficient to support Joint Venture's claim of
infeasibility. Employees could have possibly used ladders to reach the work site or a
concrete pump could be used. Joint Venture showed plain indifference to the requirements
of the Act with regard to its employees riding the concrete bucket and the Burke forms. In
this instance, it is noted that the concrete buckets were modified by an employee of CEI
to permit employees to ride on it. There were representations by CEI personnel that the
work could be performed in that manner. Although Joint Venture knew or should have known
of the hazardous conditions which constituted a serious violation of 29 C.F.R. �
1926.550(b)(2), the evidence does not show the violation was intentional and without
regard for employee safety so as to constitute a willful violation within the meaning of
the Act.

II

SERIOUS CITATION ONE, ITEM TWO

BARRICADING THE CRANES

Item Two, Serious Citation One, [[8]] charges
respondent with violating 29 C.F.R. � 1926.550(a)(9) which provides as follows:

Accessible areas within the swing radius of the rear
of the rotating superstructure of the crane, either permanently or temporarily mounted,
shall be barricaded in such a manner as to prevent an employee from being struck or
crushed by the crane.

Neale stated that "Every day I was on the site,
I observed cranes working without any barricade of any kind. . ." (Tr. 549).

Neale also testified that this violation was easily
observable by Joint Venture's management personnel: "With the size of the cranes out
there and the number of them on that site, the only way you couldn't be aware of it is if
you were totally blind" (Tr. 550).

Joint Venture argues once again that it was CEI's
responsibility to comply with the applicable standard. Once again, Joint Venture ignores
its degree of control over the work site. It was Joint Venture who exercised control over
the work site and it was Joint Venture's responsibility to protect the employees by
barricading the cranes' superstructures. Grossman Steel & Aluminum Corp., supra.

Joint Venture also argues that Neale failed to show
that employees were exposed to any danger from the rotating superstructure. This argument
is without merit.

[T]he likelihood of an employee moving into the swing
radius of the crane, when viewed at the time of the violation, is not diminished by the post
hoc observation that no one did enter the area of danger. Such after-the-fact analysis
would impede, rather than further the congressional goal of accident prevention embedded
in the Act.

Williams Enterprises, Inc ., 79 OSAHRC 4/B5, 7
BNA OSHC 1015, 1979 CCH OSHD � 23,279, pp. 28,155-28,156 (No. 14748, 1978).

Joint Venture was in serious violation of 29 C.F.R. � 1926.550(b)(2).

SERIOUS CITATION ONE, ITEM ONE

SAFETY TRAINING

Item One, Serious Citation One,[[9]] which charges
respondent with violating 29 C.F.R. � 1926.21(b)(2) which provides as follows:

The employer shall instruct each employee in the
recognition and avoidance of unsafe conditions and the regulations applicable to his work
environment to control or eliminate any hazards or other exposure to illness or injury.

Joint Venture presented evidence of regular safety
meetings (Ex. R-4). This evidence is overshadowed, however, by the ample record of safety
violations committed by Joint Venture's employees. Particularly telling is the ease with
which the supervisory personnel committed or condoned the violations; they participated in
the lift knowing the weight was excessive, and they were aware that their employees were
riding the loads.

Because the behavior of supervisory personnel sets an
example at the workplace, an employer has--if anything--a heightened duty to ensure
the proper conduct of such personnel. Second, the fact that a foreman would feel free to
breach a company safety policy is strong evidence that implementation of the policy was
lax. (Emphasis in original.)

National Realty & Construction Co. v. OSHRC, 489
F.2d 1257, 1267, fn. 38 (D. C. Cir. 1973).

Especially significant was the lack of safety
training regarding rigging and the operations involving cranes.

Any safety training Joint Venture's employees were
given was counteracted by the failure of the supervisory personnel to enforce it, or to
follow it themselves. Joint Venture was in serious violation of � 1926.21(b)(2).

The foregoing decision constitutes findings of fact
within the meaning of the Federal Rules of Civil Procedure.

ADDITIONAL FINDINGS OF FACT

  1. Archer-Western Contractors, Limited, and Gilbert
    Corporation of Delaware formed a partnership known as Archer-Western Contractors, Limited,
    and Gilbert Corporation of Delaware, a Joint Venture. Joint Venture, in which
    Archer-Western is the managing partner with a 60 percent share of the partnership,
    contracted to build the new terminal at the Palm Beach International Airport in Palm Beach
    County, Florida.

  2. The airport project is a 30-40 acre site with
    buildings encompassing about 1,500,000 square feet including a three-story terminal with
    four levels of parking above the terminal and three concourses (two 2-level concourses and
    one single-level concourse).

  3. Joint Venture did not own any of the cranes used
    at the airport project.

  4. Joint Venture did not employ any of the crane operators at the airport project.

  5. Joint Venture rented cranes with operators from
    Construction Equipment International ("CEI"), one of the largest crane companies
    with over 100 available cranes in Florida alone.

  6. CEI is a wholly-owned subsidiary of Combustion
    Engineering, Inc., and specializes in supplying manned and maintained cranes.

  7. Under this arrangement, CEI supplied Joint Venture
    with five cranes, two Manitowoc 4000-W tower cranes, a Manitowoc 3900 conventional crane
    and two Tadano hydraulic cranes.

  8. Stairwell No. 4 was being built with a Burke form,
    which was approximately 15 feet by 27 feet by 9 feet. It consisted of outer portions,
    which are not relevant to this action, and the inner four-sided form. This four-sided
    Burke form weighed approximately 20,000 pounds.

  9. The Burke forms used at the airport project had
    two walkway platforms, one three feet from the top and the other three feet from the
    bottom.

  10. The walkway platforms had guardrails.

  11. The customary method of removing the Burke forms
    was to remove the taper ties out of the concrete while the form was still connected to the
    wall by jacks.

  12. The form would then be stripped away from the wall, a method during which employees
    physically rode the load for a short amount of time as the form dropped one to two inches.

  13. On April 28, 1987, respondent's management,
    knowing that the Burke form exceeded the capacity of the Manitowoc 4000-W tower crane,
    ordered the crane company to lift the Burke form.

  14. Crane Operator Dickey initially refused to make
    the lift, stating that the load exceeded the lifting capacity of his crane.

  15. Lead Crane Operator Walters suggested that
    superintendent Link had a "way out" to get the lift if Link would state in
    writing that the form weighed only 12,000 pounds.

  16. Superintendent Link made a written note that the
    form-weighed 12,000 pounds and authorized the lift through the jib of Dickey's Manitowoc
    4000-W tower crane.

  17. Joint Venture did not use the Manitowoc 4000-W
    tower crane to make the lift which had adequate capacity and was available at the site.

  18. Link and Walters instructed Dickey to make the
    lift.

  19. Joint Venture's management, including Foreman Dave Stuart, Project Superintendent Tom
    Link and Safety Official Burt Ford were aware of the hazardous situation at Stairwell No.
    4 on April 28, 1987.

  20. As a direct result of the actions by Joint
    Venture's management personnel, the Manitowoc 4000-W tower crane collapsed, dropping metal
    beams and parts near Joint Venture's employees working in the area.

  21. On May 8, 1987, none of the cranes operating at
    the workplace had the swing radius of the superstructure guarded or barricaded in any way
    to prevent Joint Venture's employees from being struck or crushed.

  22. The lifting beam used by the Manitowoc 4000-W
    tower crane which collapsed on April 28, 1987, was supplied to Joint Venture by the Burke
    Company.

  23. Henry Siegel, a Burke Company representative,
    provided a Burke Company diagram of the lifting beam which showed 7/8-inch slings or
    spreaders above the beam.

  24. Frederick Popovic, a structural engineer with the
    consulting firm of Wiss, Janney, Elstner, Associates, Inc., in Northbrook, Illinois,
    inspected the airport site after the boom collapsed. Mr. Popovic inspected the lifting
    beam, measured the dimensions of all the plates to the beams and measured the distance
    between the lift points on the beam.

  25. The distance between the lift points on the beam
    was 11 feet.

  26. OSHA Inspector Neale did not measure the distance
    between the lift points on the beam.

  27. OSHA Inspector Neale did not weigh the lifting
    beam.

  28. OSHA Inspector Neale based his calculations for
    the total weight of the lift on the weight of the lifting beam provided on the general
    Burke Company diagram.

  29. OSHA Inspector Neale did not measure the angle from the spreader to the lifting beam
    but rather used a "rule of thumb" of a 45 degree angle.

  30. Joint Venture's crane expert, Donald Markwardt,
    calculated the angle between the lifting beam and the spreaders based on 11 feet between
    the lift points on the beam as measured by Mr. Popovic and 20 feet as the length of each
    spreader.

  31. The vertical spreader angle on the spreader above
    the lifting beam was 16 degrees.

  32. The spreader used by the Manitowoc 4000-W tower
    crane which collapsed on April 28, 1987, was independent wire rope core.

  33. OSHA Inspector Neale did not measure the rigging
    length used by the Manitowoc 4000-W tower crane which collapsed on April 28, 1987.

  34. OSHA Inspector Neale did not record the length of
    the spreaders used by the Manitowoc 4000-W tower crane on April 28, 1987.

  35. OSHA Inspector Neale measured the diameter of
    only one of the spreaders used by the Manitowoc 4000-W tower crane which collapsed on
    April 28, 1987.

  36. Seven-eighths inch diameter spreaders were
    regularly used on the Manitowoc 4000-W tower cranes at the airport project.

  37. A special mancage-type platform was attached to
    the concrete bucket used while pouring concrete columns.

  38. This platform attachment had guardrails.

  39. The platform attachment was used to lift
    personnel attached to the platform with safety lines and lanyard lines.

  40. CEI Lead Operator Walters made the platform attachment used on the concrete bucket.

  41. CEI Lead Operator Walters told Project manager
    Payne that he had used similar attachments on other jobs and that this was the best way to
    pour the concrete columns.

  42. The height of the columns was 21 feet and the
    concrete bucket had to be raised 18 feet above the column.

  43. Death or serious injury would likely result from
    the violative conditions described above.

  44. Archer-Western Contractors, Ltd.
    ("Archer-Western") is the general contractor for the Sunny Isles project.

  45. Archer-Western purchased the cranes used at the
    Sunny isles project.

  46. The Sunny Isles project is located on Sunny Isles
    Boulevard and intercostal waterway, Route 826 in North Miami Beach.

  47. The project is approximately a mile long and runs
    from the west side of the intercostal waterway to the east side over the intercostal and
    up to Route 81A or Collins Avenue at the ocean.

  48. The project involves the construction of two
    bridges, each approximately 1300 feet long, and the removal of the existing bridge and
    roadwork.

  49. At the Sunny Isles project, Archer-Western owned two small Grove rough terrain cranes,
    one 150-ton crawler crane and two 60-ton crawlers.

  50. On December 3, 1986, an Archer-Western employee
    was electrocuted when a crane got too close to electrical wires while it was unloading
    from a truck.

  51. The employee's death resulted in a citation from
    OSHA.

  52. In an attempt to abate the citation,
    Archer-Western requested a safety presentation by the OSHA office.

  53. The presentation was held on December 11, 1986.

  54. Archer-Western also requested the State of
    Florida to conduct a mock inspection of the Sunny Isles project.

  55. On February 10, 1986, the OSHA inspector returned
    for a follow-up inspection and noted that the problems at Sunny Isles were "fully
    abated."

CONCLUSIONS OF LAW

  1. Respondent, at all times material to this
    proceeding, was engaged in a business affecting commerce within the meaning of section
    3(5) of the Occupational Safety and Health Act of 1970 ("Act").

  2. Respondent, at all times material to this
    proceeding, was subject to the requirements of the Act and the standards promulgated
    thereunder. The Commission has jurisdiction of the parties and of the subject matter.

  3. Respondent was in willful violation of 29 C.F.R. � 1926.550(a)(1) for exceeding the
    lift capacity of a crane's boom, resulting in the boom's collapse. Respondent was aware of
    the load's excessive weight yet ordered the lift to go forward.

  4. Respondent was not in willful. violation of 29
    C.F.R. � 1926.251(c)(1) for exceeding the lift capacity of a crane's rigging. The
    Secretary failed to prove that inadequate rigging was used.

  5. Respondent was in serious violation of 29 C.F.R.
    � 1926.550(b)(2) for allowing employees to ride the loads of cranes. Respondent was aware
    that employees were riding Burke forms and in a modified concrete bucket.

  6. Respondent was in serious violation of 29 C.F.R.
    � 1926.550(a)(9) for failing to barricade the swing radius of a crane's rotating
    superstructure.

  7. Respondent was in serious violation of 29 C.F.R.
    �1926.21(b)(2) for failing to instruct its employees in the recognition and avoidance of
    unsafe conditions.

ORDER

It is ORDERED:

  1. That Citation Number Two, Item one, which alleges
    a willful violation of 29 C.F.R. � 1926.251(c)(1), is vacated.

  2. That Citation Number Two, Item Two, which alleges a willful violation of 29 C.F.R. �
    1926.550(a)(1), is affirmed and a penalty of $10,000 is assessed.

  3. That Citation Number Two, Item Three, which a willful violation of 29 C.F.R. �
    1926.550(b)(2), is affirmed as a serious violation and a penalty of $1,000 is assessed.

  4. That Citation Number One, Item One, which alleges
    a serious violation of 29 C.F.R. � 1926.21(b)(2), is affirmed and a penalty of $1,000 is
    assessed.

  5. That Citation Number One, Item Two, which alleges
    a serious violation of 29 C.F.R. � 1926.550(a)(9), is affirmed and a penalty of $1,000 is
    assessed.

  6. That Citation Number One, Item Three, which
    alleges a serious violation of 29 C.F.R. � 1926.550(b)(2), is vacated.

Dated this 3rd day of November, 1988

JOE D. SPARKS

Judge

FOOTNOTES:

[[1/]]Neither party took exception to the judge's disposition of the other items and they
are not before us on review.

[[2/]]The record does not indicate whether CEI was
trying to ensure that the form did not exceed the lift capacity of the crane or merely to
protect itself from liability.

[[3/]] The standard states:

�1926.550 Cranes and derrick.

(a) General requirements. (1) The employer shall comply with the
manufacturer's specifications and limitations applicable to the operation of any and all
cranes and derricks. Where manufacturer's specifications are not available, the
limitations assigned to the equipment shall be based on the determinations of a qualified
engineer competent in this field and such determinations will be appropriately documented
and recorded. Attachments used with cranes shall not exceed the capacity, rating, or scope
recommended by the manufacturer.

[[4/]]The Secretary argues that under Commission rule
92(c), 29 C.F.R. � 2200.92(c) the Commission is precluded from considering the issue
because it was not raised before the judge. The argument is without merit. The matter was
clearly raised in Respondent's post-hearing brief before the judge. It is, therefore,
properly before the Commission.

[[5/]] Respondent argues that, under the cited
standard, only when an applicable load chart is unavailable may the Secretary adduce the
testimony of "competent engineers" to establish the capacity of the crane.
Because the Secretary failed to prove the unavailability of an applicable load chart,
Respondent claims that she could not present expert testimony on the crane's capacity.

This argument is rejected. The cited standard imposes a duty on an employer to comply with
the crane manufacturer's specifications and limitations. When a load chart is unavailable,
the employee is obliged to use a competent engineer to determine the capacity of the
crane. However, the duties imposed on the employer by the standard do not limit the
methods the Secretary relies on to establish that the employer failed to comply with this
obligation.

[[6/]] Respondent's culpability does not necessarily
excuse CEI for its responsibility in this matter. Under pressure from the Joint Venture,
CEI's operator made the lift with full knowledge that the form exceeded the lift capacity
of the crane. However, the record does not reveal whether CEI was cited for any possible
violation.

[[7/]]Respondent also argues that the judge erred by
relying in part upon another crane accident for his finding that the violation was
willful. In that incident, an Archer-Western employee was electrocuted when a crane hit an
overhead power line. Even though Gilbert was not part of that project, the judge found
Archer-Western's previous experience to be imputable to the Joint Venture because
Archer-Western was the Joint-Venture's managing partner. Given our finding that events at
the site of the accident were sufficient to establish that the violation was willful, it
is unnecessary for us to decide whether the judge properly relied, in part, on the Sunny
Isles Project incident.

[[8/]] The standard states:

�1926.21 Safety training and education.

(b) Employer responsibility.

(2) The employer shall instruct each employee in the recognition and avoidance of
unsafe conditions and the regulations applicable to his work environment to control or
eliminate any hazards or other exposure to illness or injury.

[[1]] A third item, 29 C.F.R. �1926.550(b)(2) for
failure to provide signal men for moving cranes carrying loads, was the subject of a
motion to dismiss made by Joint Venture at the close of the Secretary's case. The motion
was taken under advisement (Tr. 630-631). Subsequently, the Secretary withdrew the item in
her posthearing brief (Secretary's brief, pp. 2-3). Accordingly, the third item of
Citation Number One is dismissed and will not be considered in this decision.

[[2]] Willful Citation Two, Item One, alleges the
following violation:

29 CFR 1926.251(c)(1): Single leg and two (2) leg bridle slings were used in excess
of safe walking loads as determined by Tables H-3 through H-14:

(a) On or before April 28, 1987, at the West Palm Beach International Airport
Project, stairwell #4. A lifting beam used to raise "Burke Forms" weighing
approximately 20,000 lbs. was attached to the crane hook by a 5/8" diameter I.W.R.C.
two (2) legged bridle sling, with a S.W.L. of 9600 # (by table H-8). The lifting beam was
then attached to the "Burke Form" by four (4) 5/8" diameter. I.W.R.C.
single leg slings with a S.W.L. of approximately 8800#. (Table H-3). (S.W.L. limited to 2
leg sling maximum.

[[3]] Willful Citation Two, Item Two, alleges the
following violation:

29 CFR 1926.550(a)(1): The employer did not comply with the manufacturer's
specifications and limitations applicable to the operation of cranes or derricks:

(a) On or before April 28, 1987, at the West Palm Beach International Airport
Project, stairwell #4. A Manitowoc 4000-W tower crane was loaded in excess of the
manufacturers rated capacity for the 40-0' jib.

[[4]] Foreman Stuart's testimony was unequivocal as
follows (Tr. 304-305):

BY MR. CLARK:

Q. Were you at the airport workplace on April 28, 1987?

A. Yes, sir.

Q. What were your duties on that date?

A. I was foreman at the time.

Q. And, what specific assignments were you given for that date?

A. To raise the form at Stairwell Number 4.

Q. When were you given that assignment?

A. That morning.

Q. Who told you that you should raise the form in Stairwell Number 4?

A. The superintendent, Tom Link.

Q. About what time was that?

A. The first thing that morning; about between 7:00 and 7:30.

[[5]] No attempt is made to determine whether CEI
also violated the standard as it was not charged by the citation at issue.

[[6]] Payne testified that, after speaking with
Lothian, he instructed Link not to make the lift using Dickey's crane (Tr. 379). In view
of the serious concerns discussed previously, this testimony is not deemed credible as it
is highly unlikely that Link would have ordered the lift in contravention of instructions
from Payne and against the advice of all crane operators.

[[7]] Willful Citation Two, Item Three, alleges the
following violation:

29 C.F.R 1926.550(b)(2): Section 5-3.2.3.e. American National Standards Institute,
B30.5-1968, Safety code for Crawler Locomotive and truck cranes, as adopted by 29 CFR
1926.550(b)(2):

(a) Crane operators were permitted to Hoist lower swing, or travel, while employees
were on the load or hook: On a before April 18, 1987, at the West Palm Beach International
Airport Project, employees were permitted to ride "Burke forms" and
"Concrete Buckets" while they were raised to working locations, 20- 0 to 50-0'
height, by mobile cranes.

[[8]] Serious Citation One, Item Two, alleges the
following violation:

29 CFR 1926.550(a)(9): Accessible areas within the swing radius of the rear of the
rotating superstructure of cranes were not barricaded in such a manner as to prevent
employees from being struck or crushed by the crane:

(a) On or about May 5, 1987, at the terminal building north and south sides, a
Manitowoc 4000-W Tower Crane, did not have the area between the counter-weight swing
radius and scaffolding, Porti-Potti, form work and other building material protected.

[[9]] Serious Citation One, Item One, alleges the
following violation:

29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition
and avoidance of unsafe conditions and the regulations applicable to his work environment
to control or eliminate any hazards or other exposure to illness or injury:

(a) On or about May 5, 1987, at the West Palm Beach International Airport, employees
were not given safety training or instructions, including but not limited to the
following:

I.

A. Hand and radio signaling of the Cranes. 1. Proper signals, and radio procedures.

B. Flagging cranes when they are relocating or travelling.

  1. Proper signals and precautions.

II.

A. Proper and accepted industry practices rigging material to be hoisted by a crane.

  1. How to properly calculate or determine material weights.

  2. What size and type rigging hardware, and components to use for various lifts.

  3. How to find S.W.L. of components: 4. Who is designated competent person charge of
    critical lifts, and has authority to abort improperly rigged lifts:

III.

A. Accepted manufacturers specifications recommendations for proper use of crane and their
components.

  1. Maximum loads allowed at various radiuses with different crane configurations, such as:

a.towers

b.jibs

c.conventional booms

d. Hydro-cranes.