Evergreen Environmental Services (Commission decision, October 12, 2017)
Late contest reinstated after office damage
Apply this precedent to your situation
This is citable Commission precedent from 2017, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.
Plain-English summary
Evergreen Environmental Services received a two-item citation shortly before water damage disrupted its headquarters and forced its safety analyst out of her office. The citation was moved with wet paperwork and found after repairs, leading Evergreen to file its notice of contest six working days late. The judge denied relief, but the Commission found no bad faith, prejudice, or impact on proceedings, and noted that the Secretary did not oppose reinstatement. The Commission also found that Evergreen had normal procedures for routing OSHA citations and that the water damage, not gross carelessness, explained the delay. It reversed the judge, reinstated the notice of contest, and remanded the case for further proceedings.
Decision snapshot
- Cited standard(s): The decision identifies two process-safety-management provisions but does not give their subsection numbers.
- Outcome: Denial of late-contest relief reversed; notice of contest reinstated; case remanded.
- Key point: A short filing delay may be excusable when an unexpected office emergency disrupts otherwise orderly citation-handling procedures and causes no prejudice.
Full text (OSHRC public release)
Document
United States of America
OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION
1120 20th Street, N.W., Ninth Floor
Washington, DC 20036-3457
SECRETARY OF LABOR,
Complainant,
v.
OSHRC Docket No.
16-1295
EVERGREEN ENVIRONM E NTAL SERVICES ,
Respondent.
APPEARANCES:
Christopher Lopez-Loftis, Trial Attorney; Jin Y. Chong, Attorney; Madeline T. Le, Counsel for Occupational Safety and Health; James E. Culp, Regional Solicitor; Nicholas C. Geale, Acting Solicitor of Labor, U.S. Department of Labor, Washington, DC
For the Complainant
W. Jackson Wisdom, Esq., Martin, Dis i ere, Jefferson & Wisdom LLP, Houston, TX
For the Respondent
DECISION AND
REMAND ORDER
Before: MACDOUGALL, Chairman; ATTWOOD
and
SULLIVAN, Commissioner s .
BY THE COMMISSION:
B efore the Commission is
a decision by
Administrative Law Judge John B. Gatto
denying
a
motion
by Evergreen Environmental Services
for relief
under Federal Rule of Civil Procedure 60(b)(1) from a final order result ing from Evergreen’s failure to timely file a notice of contest (NOC) to a citation issued by the Occupational Safety and Health Administration. See 29 U.S.C. § 659(a) (employer’s failure to notify Secretary of intent to contest citation and proposed penalty within fifteen working days results in citation and penalty becoming a final order of the Commission).
For the following reaso ns, we reverse the judge’s decision , reinstate Evergreen’s NOC , and remand th e case to the judge for further proceedings.
BACKGROUND
On
June
28, 2016,
OSHA issued
Evergreen
a tw o- item citation
following
a n
inspection
of
a
worksite
in Pasadena, Texas. 1
It is undisputed that
Evergreen ’s receptionist
received the citation
t wo days later, on
Thursday,
J une 3 0, 2016 . The citation was given
to
Evergreen’s
Safety Analyst, Elizabeth Botello , prior to the beginning of the July 4 th holiday weekend (Saturday, July 2, 2016 to Monday, July 4, 2016) .
The following
Tuesday, July 5, 2016 , Ms. Botello returned to work to find water damage to her office ceiling and water dripping onto the equipment and paperwork on her desk .
T hese items — including the citation — were immediately re moved from her office , and she began using a conference room as a temporary work space . That same day, Eve rgreen engaged an air conditioning repair company to determine the cause of the water damage , and a construction company to remove mold and repair the dama ged sheet rock. I nvoices submitted by Evergreen show that the damage was not confined to Ms. Botello’ s office, as repairs were also made to hallways , the reception area , and other offices . Evergree n discovered mor e damage approximately three weeks later, on July 23, 2016, and hired another air conditioning repair company to make further repairs.
Ms. Botello was able to move back into her office on August 1, 2016 . At that point, the citation was found among the papers that had be en removed from her office due to water damage. The following day, August 2, 2016, Evergreen mailed its NOC to Mark Briggs, OSHA’s Area Director fo r the Houston South A rea O ffice . Mr. Briggs informed Evergreen that the last day of the fifteen-day c on test period was July 22, 201 6 , so the NOC was untimely .
On August 12, 2016 , E vergreen filed
a
motion for relief pursuant to Rule 60(b) (1)
with the Commission , claiming that its
failure
to timely
file
was
excusable
because of the water damage
in
Evergreen’s
headquarters . In response to Evergreen’s motion, the Secretary filed a letter with the Commission on August, 31 , 2016, stating that “the Secretary is in receipt of the Respondent’s Motion for Relief under Fed. R. Civ. P. 60(b) and is not opposed to the Motion.” On June 9, 2017, the ju dge issue d an order denying the motion .
DISCUSSION
When an
employer
does not
notify the Secretary of its intent to contest a citation within fifteen working days of the employer’s receipt of the citation , the citation becomes a final order of the Commission by operation of law . 29 U.S.C . § 659(a). Under Rule 60(b) (1) , the Commission may provide relief from a final order due to a party’s “mistake, inadvertence, surprise, or excusable neglect.” 2 Fed. R. Civ. P. 60(b)(1). See also 29 U.S.C. § 661(g) ( Commission proceedings shall be in accordance with the Federal Rules of Civil Procedure unless the Commissi on has adopted a different rule ) . In evaluating a claim of excusable neglect under Rule 60(b)(1), the Commission applies the framework set out in Pioneer Inv. Servs. Co. v. Brunswick Assocs. Ltd. P’ship , 507 U.S. 380, 395 (1993):
[T]he determination
is at bottom an equitable one, taking account of all relevant circumstances surrounding the party’s omission. These include
. . .
the danger of prejudice to the [opposing party], the length of the delay and its potential impact on judicial proceedings, the reason for the delay, including whether it was within the reasonable control of the movant, and whether the movant acted in good faith.
There is no evidence
here
that Evergreen acted in bad faith or that its untimely NOC — submitted only six working days after the expiration of the fifteen-day contest period — had any impact on the Commission’s proceedings. Moreover, there is no prejudice to the Secretary in granting relief because the Secretary does not oppose Evergreen’s motion. As to control, Evergreen clai ms that the reason for the delay in filing its NOC was the “temporary crisis” the water damage created, requir ing Evergreen to focus on “repairing its office, preventing and mitigating mold, fixing damaged ceilings, and restoring a safe work environment.” Evergreen further contends that it promptly notified the Secretary of its intent to contest the citation once it was found among the wet papers removed from Ms. Botello’s office.
In denying Evergreen’s motion,
the judge acknowledged the
water damage
and the
“ numerous repairs ”
that occurred during
and after
the fifteen-day contest period , but
found
that Evergreen failed to demonstrate that the repairs interfered with its ability to timely file its NOC . Therefore, the judge concluded that “the record reflects that Evergreen failed to . . . maintain orderly office procedures for handling important documents , ” which he characterized as “gross carelessness . ”
W e
disagree .
Bill Shaw, Evergreen’s “Vice President f or HSE , ” states in his affidavit that Evergreen’s receptionist received the citation and gave it to Ms. Botel lo, Evergreen’s Safety Analyst.
There is nothing in the record to suggest that the citation was initially mishandled or f ailed to reach the appropriate employee . Thus, we find that Evergreen had procedures in place for handling and directing the citation for processing . Compare NYNEX , 18 BNA OSHC 1944 , 1947 (No. 95-1671, 1999) (no relief when citation was mistakenly forwarded to different office location) (quoting E.K. Constr. Co. , 15 BNA OSHC 1165, 1166 (No. 90-2460, 1991); Villa Marina Yacht Harbor, Inc. , 19 BNA OSHC 2185, 2187 (No. 01-0830, 2003) (no relief when company messenger mishandled mail).
That these procedures did not result in the timely filing of Evergreen’s NOC does not mean the procedures were inadequate . Rather, the record supports Evergreen’s claim that its procedures were hampered by the unanticipated water damage to its office s . The affidavits and repair invoices show that the water damage occurred within one to four days of Evergreen’s receipt of the citation and that th is damage was extensive , affect ing not only Ms. Botello’s office, but also the hallways, reception ar ea, and other offices .
R epairs
continued to be
necessary
past
the contest deadline. T he citation was removed from Ms. Botello’s office because of this water damage, and she was moved to a conference room until August 1, 2016 , five working days after the contest deadline. The very same day she was able to return to her office to conduct normal business, Evergreen found the citation among the papers that had been removed due to water damage from this unforeseen event and mailed its NOC the following day .
In short, nothing in the record supports the judge’s finding of “gross carelessness” on Evergreen’s part. Finally, we find it significant, al though not controlling, that the Secretary does not oppose Evergreen’s motion for relief ; therefore, he does not dispute any of the company’s contentions .
Under these circumstances , we
conclude
that
Evergreen has established that
its untimely filing
was
excusable .
I n addition to establishing that the neglect was excusable, t o prevail on a motion for relief pursuant to Rule 60(b)(1), the Commission and the Fifth Circuit (to which this case may be appealed) require the moving party to allege a meritorious defense. Northwest Conduit Corp. , 18 BNA OSHC 1948, 1951 (No. 97-0851, 1999 ) . See also Marshall v. Monroe & Sons , 615 F.2d 1156, 1160 (5th Cir. 1980). The Commission has generally found this requirement to be “satisfied with minimal allegations that the employer could prove a defense if given the opportunity.” Jackson Assocs. of Nassau , 16 BNA OSHC 1261, 1267 (No. 91-0438, 1993). Here, we find Evergreen has also satisfied this requirement by alleging two defenses in its motion:
that it lacked knowledge of the cited conduct, and that OSHA cited the wrong employer .
Accordingly,
we
reverse the judge’s decision deny ing
Evergreen’s
motion
for relief
under
Rule 60(b)(1) , reinstate Evergreen’s
NOC , and remand
the case
to the judge for further proceedings.
SO ORDERED.
/s/
Heather L. MacDougall
Chairman
/s/
Cynthia L. Attwood
Commissioner
/s/
James J. Sullivan, Jr.
Dated: October 12, 2017 Commissioner
United States of America
OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION
100 Alabama St. S.W
Building 1924 Room 2R90
Atlanta, GA 30303-314
SECRETARY OF LABOR,
Complainant,
v.
OSHRC Docket No.
OSHRC ,
Respondent.
ORDER DENYING
OSHRC’
MOTION FOR
RULE
60(b )
RELIEF
COUNSEL:
Christopher D'Allen Lopez-Loftis, Attorney, Office of the Solicitor, U.S. Department of Labor, Dallas, TX, for Complainant.
W. Jackson Wisdom, Attorney,
Martin, Disiere, Jefferson & Wisdom, LLP, Houston, TX, for Respondent.
I. INTRODUCTION
Pending before the Court is
Evergreen’s motion
seeking relief
under
Rule
60(b)(1)
of the Federal Rules of Civil Procedure. 3 In its motion, Evergreen argues it is entitled to relief under Rule 60(b)’s “excusable neglect” standard. (Mot. 3.) The Secretary filed a response indicating he did not oppose the motion. However, the Commission’s jurisdiction may not be created by assent. Atl.& Gulf Stevedores, Inc., 3 BNA OSHC 1003, 1004 (No. 2818, 1975). 4 Although unopposed motions are often summarily granted, a motion that effectively seeks to excuse a late-filed notice of contest is different because a timely filed notice of contest establishes the Commission’s jurisdiction . Sharon & Walter Constr., Inc. , 23 BNA OSHC 1286, 1288, n. 2 (No. 00-1402, 2010) (citation omitted). The burden is still on Evergreen to show it is entitled to relief under the rule. U.S. v. Harrison County, Mississippi , 463 F.2d 1328, 1330 (5th Cir.1972).
Under section 10(a) of the Occupational Safety and Health Act, an employer is required to notify the Secretary of Labor (“Secretary”) of its intent to contest a citation within 15 working days of receipt. See 29 U.S.C. § 659(a). Failure to timely file a contest notice results in the citation becoming a final order of the Commission by operation of law. Id.
On June 28, 2016, t he Occupational Safety and Health Administration (“OSHA”) issued 5 a citation to Evergreen Environmental Services (“Evergreen”) with a proposed penalty of $14,000.00, which was received by Evergreen on June 30, 2016. Therefore, July 22, 2016, was the last day to timely file a notice of contest. On August 2, 2016, Evergreen mailed its contest to the OSHA Area Director, which was rejected by OSHA as untimely on August 8, 2016, since the citation had already becom e a final order of the Commission by operation of law.
I I . UNDISPUTED FACTS 6
The citation was received
on June 30, 2016, by Evergreen's receptionist, Shelia Houston, and promptly given to Elizabeth Botello, Evergreen’s Safety Analyst. (Motion at 1) ( citing Shaw Aff.
¶
4; Ex.
A). After
returning to work from
the
July 4 th
holiday weekend,
Botello
found
water damage
to
her office ceiling and water dripping onto her desk, including on the paperwork, keyboard computer, monitor, and phone on her desk. ( Id. ) ( citing Botello Aff.
¶ 2). These items, including the citation,
were
immediately moved
out of
Botello’s
office
and she began working
out of a conference
room. ( Id.
1-2) ( citing
Botello
Aff.
¶ 3).
Evergreen called an air conditioner repair company to determine the cause of damage and a construction company to repair and repaint the damaged sheet rock. ( Id. at 1-2) ( citing Shaw Aff. ¶ 6; Ex. B-C). After more damage was found, Evergreen initiated more repairs on July 23, 2016. ( Id. at 2) ( citing Shaw Aff. ¶ 6; Ex. D). Botello did not move back into her office until August 1, 2016. ( Id. ) ( citing Botello Aff. ¶ 4).
According
to Bill Shaw, Evergreen’s “Vice President of HSE,” on August 1, 2016, Evergreen found the citation among the wet papers that had been removed from Botello’s office. ( Id. ) ( citing Shaw Aff.
¶ 7). On August 2, 2016, Evergreen mailed its
notice of contest to the Area Director
and on August 8, 2016, Mark Briggs, OSHA’s Area Director, issued a letter to Evergreen rejecting the contest as untimely. ( Id. ) ( citing Ex. E; Ex. F).
I I I. ANALYSIS
Rule 60(b) of the
Federal Rule of Civil Procedure
provides that “[o]n motion and just terms, the court may relieve a party or its legal representative from a final judgment, order, or proceeding ....” Fed. R. Civ. P. 60(b). Under longstanding Commission and Fifth Circuit 7 precedent , relief may be granted under Rule 60(b) for noncompliance with the contest period specified in section 10(a) of the OSH Act in certain situations. Calhar Constr., Inc. , 18 BNA OSHC
¶ 2151,
2153
( No. 98-0367 , 2000)
( citing Northwest Conduit Corp. , 18 BNA OSHC 1948, 1949-50 (No. 97-851, 1999); Jackson Assocs. o f Nassau , 16 BNA OSHC 1261, 1264-65 (No. 91-438, 1993); Branciforte Builders, Inc. , 9 BNA OSHC 2113, 2116-17 (No. 80-1920, 1981) ; Atlantic Marine Inc. v. Occupational Safety & Health Review Comm'n , 524 F.2d 476, 478 (5th Cir. 1975) ; Craig Mechanical Inc. v. Occupational Safety & Health Review Comm'n , 55 F.3d 633 (5th Cir. 1995). 8
Rule 60(b)(1) provides
in relevant part
that relief may be granted from a final order entered due to the party’s excusable neglect. Fed.R.Civ.P. 60(b)(1).
In
Northwest Conduit , the
Com mission held it applies the meaning of “excusable neglect” as enunciated by the Supreme Court in Pioneer Inv. Co. v. Brunswick Assocs. Ltd. Partnership , 507 U.S. 380 (1993). See Northwest Conduit , 18 BNA OSHC at 1950. In Pioneer , the Supreme Court held “e xcusable neglect ” is “ understood to encompass situations in which the failure to comply with a filing deadline is attributable to negligence .” Pioneer , 507 U.S. at 394. As the Pioneer Court found, “t he determination is at bottom an equitable one, taking account of all relevant circ umstances surrounding the party’ s omission . These include … t he danger of prejudice to the
[nonmovant] , the length of the delay and its potential impact on judicial proceedings, the reason for the delay, including whether it was within the reasonable control of the movant, and whether the movant acted in good faith .” Pioneer , 507 U.S. at 395 .
As
Evergreen
notes,
the Co mm ission has reco gnized in Rule 60(b) (1) late filing cases “ it is usually a given that there is ‘ a lack of prejudice to the Secretary or to the interests of efficient judicial administration, combined with a lack of bad faith by the employer. ’” (Mot. 3) ( citing Calhar Constr., Inc. , 18 BNA OSHC at 2151 n. 5). Since the Secretary did not oppose Evergreen’s motion for relief, the Court concludes there is no prejudice to the Secretary or to the interests of efficient judicial administration and there is no evidence of bad faith by Evergreen.
In support of its argument that it
is entitled to relief under
Rule
60(b)'s
“e xcusable
n eglect ” s tandard ,
Evergreen
asserts “ due to a temporary crisis in the office , Evergreen had to focus its efforts in repairing its office, preventing and mitigating mold, fixing damaged ceilings, and restoring a safe work environment ” and that “[a] fter
…
Evergreen was able to return to its regular course of business , Evergreen quickly acted upon the C itation and sent the Area Office its Notice of Contest. ” (Mot. 4) ( citing Ex. E). As indicated infra , t he Court concludes Evergreen ’s conduct did not amount to excusable neglect warranting Rule 60(b) (1) relief.
As the Fifth Circuit has recently reiterated,
Rule 60(b)(1) provides relief for a party
“ if the party dem onstrates that its failure (1) ‘ resulted from justifiable neglect ’ and (2) ‘ that a fair probability of success on the merits existed if the judgment were to be set aside. ’” Long v. James , 667 F. App'x 862, 863 (5th Cir. 2016) (citation omitted ) . Here, even though Evergreen was involved in numerous repairs, “which were a high priority of business,” it has not shown th os e repairs interfer ed in its ability to timely file its notice of contest .
While the repairs were ongoing
Botello continued to work out of a conference room and she offers no explanation in her affidavit for her failure to timely file the notice of contest, other than she was not able to move back into her office “to conduct normal business until August 1, 2016.” (Botello Aff. ¶ 4 ). The Court concludes this is not an adequate excuse for Evergreen ’s inaction under the terms of Rule 60(b)(1 ), “which requires a showing of ‘excusable’ neglect and not just a showing of simple negligence. ” Louisiana-Pacific Corp. , 13 BNA OSHC 2020, 202 3 (No. 86-1266, 1989). Therefore, Botello ’s neglect was not “excusable.”
Equally important, e mployers must maintain orderly procedures for handling important documents, and when the lack of such procedures results in the untimely filing of a notice of contest, Rule 60(b) relief is not warranted. A.W. Ross , Inc ., 19 BNA OSHC 1147, 1149 (No. 99-945, 2000) ; Louisiana-Pacific Corp. , 13 BNA OSHC at 2021. Gross carelessness is an insufficient bas i s for 60(b)(1) relief. Edward H. Bohlin Co. v. Banning Co. , 6 F.3d 350, 357 (5th Cir. 1993) .
Cf. Sadowski v. Bombardier Ltd. , 539 F.2d 615, 618 (7th Cir.1976) (Rule 60(b) cannot be invoked “to give relief to a party who has chosen a course of action which in retrospect appears unfortunate or where error or miscalculation is traceable really to a lack of care.”) .
The record reflects Evergreen failed to timely file the notice of contest because it failed to maintain orderly procedures for handling its important documents. As Evergreen admits, on August 1, 2016, it “ found” the citation among the wet papers that had been removed due to water damage. (Shaw Aff. ¶ 7) (emphasis added) . However, Evergreen offered no explanation as to why the citation could not have been found while repairs were being made, in particular, since Botello continued working, albeit, out of the conference room. This g ross carelessness is an insufficient bas i s for 60(b)(1) relief .
Thus, t he
Court concludes the
reason for the delay was
within the reasonable control of
Evergreen; had it simply maintained orderly procedures for handling important documents such as the citation, it could have ensured that its notice of contest was timely filed. T aking account of all relevant circ umstances surrounding Evergreen’s omission , the Court concludes Evergreen has not shown excusable neglect under Rule 60(b)(1). Accordingly,
IV. ORDER
IT IS HEREBY ORDERED THAT
Evergreen’s motion for Rule 60(b) relief based upon excusable neglect is DENIED , its late Notice of Contest is DISMISSED , and the scheduling order setting this case for trial is VACATED .
SO ORDERED .
/s/ John B. Gatto
John B. Gatto
Administrative Law Judge
Dated: June 20 , 2017
"
1
In the citation, the Secretary alleges serious violations of two provisions of 29 C.F.R. § 1910.119 (Process safety management of highly hazardous chemicals), and proposes a penalty of $7,000 for each item.
2
Rule 60(b)(1) provides
in full
that “ [o] n motion and just terms, the court may relieve a party or its legal representatives from a final judgment, order, or proceeding for the following reasons: (1) mistake, inadvertence, surprise, or excusable neglect[.]” Fed. R. Civ. P. 60(b)(1).
3
Upon recently reviewing the case file, the Court noted Evergreen’s Rule 60(b) motion , which had been filed while the case was still assigned to the chief judge, was still pending .
4
It has long been recognized courts are not bound to accept stipulations as to questions of law. Estate of Sanford v. Comm'r of IRS , 308 U.S. 39, 51 (1939). Rather, when an issue or claim is properly before the court, the court is not limited to the particular legal theories advanced by the parties, but rather retains the independent power to identify and apply the proper construction of governing law. See , e.g., Kamen v. Kemper Fin. Servs., Inc . , 500 U.S. 90, 99, (1991); and Arcadia v. Ohio Power Co.,</sp
Does this precedent still control your case?
Ezel checks whether it still stands, including any court review since, and applies it to your situation with citations.
Opens in Ezel Pro.
- Checks the law as it stands today, not only this page
- Cites every source it relies on, so you can verify it
- Chat, drafting and research in one workspace