Deering-Milliken, Inc. (Commission decision, December 23, 1982)

Noise violations sent back for reconsideration under the achievable test

Decision type
Commission decision
Dockets
12598, 13037
Decided
December 23, 1982
Outcome
Remanded
Precedential status
Citable Commission precedent
Checked against source
2026-09-11
Cited standards

Apply this precedent to your situation

This is citable Commission precedent from 1982, and it may have been appealed since. Ezel checks how it stands today and answers your situation, with citations.

Currency note: this decision dates from 1982
The OSHA standards may have been amended, penalty amounts have been adjusted, and later Commission or court decisions may have changed the analysis since then. Treat this page as historical context, not current compliance advice. Verify the current standard before relying on any specific rule, threshold, or penalty mentioned here.
Decision of the Commission; remand order
The Commission vacated the judge's noise-standard ruling and returned the case for evidence and a new decision on technological and economic feasibility. The alleged violations remained unresolved. The full text below is from the official OSHRC release.
About this page: The plain-English summary and decision snapshot below were written by Ezel based on the official OSHRC release. The full text is the agency's own release.
Read the official release (oshrc.gov)

Plain-English summary

This short order of remand covers two consolidated dockets involving alleged violations of the occupational noise standard at 29 C.F.R. § 1910.95(b)(1). While the case was pending, the Commission followed the Supreme Court's decision in American Textile Manufacturers Institute, Inc. v. Donovan and held that "feasible" under the noise standard means achievable. That ruling overruled the cost-benefit test of feasibility from Continental Can Co. and substituted a test consistent with the Supreme Court's decision. Because the judge had ruled under the superseded test, the Commission vacated his decision on the alleged violations and remanded. The parties may make further evidentiary submissions on remand so that technological and economic feasibility, which are intertwined, can be reconsidered under the test established in Sun Ship, Inc. Chairman Rowland dissented from the remand, taking the position that the requirement in section 1910.95(b)(1) to use feasible administrative or engineering controls is invalid.

Decision snapshot

  • Cited standard(s): 29 C.F.R. § 1910.95(b)(1)
  • Outcome: The judge's decision on the alleged noise violations was vacated and the consolidated case remanded.
  • Key point: An intervening change to the feasibility test led the Commission to vacate the judge's ruling and allow further evidence on remand.

Full text (OSHRC public release)

Docket Nos. 12598; 13037

DEERING-MILLIKEN, INC.

OSHRC Docket Nos. 12598; 13037

Occupational Safety and Health Review Commission

December 23, 1982

[*1]

Before: ROWLAND, Chairman; CLEARY and COTTINE, Commissioners.

COUNSEL:

Office of the Solicitor, USDOL

Bobbye D. Spears, Regional Solicitor, U.S. Department of Labor

Richard O'Brecht, for the employer

Gregory B. Tobin, for the employer

OPINION:

ORDER OF REMAND

BY THE COMMISSION:

In accordance with the decision of the U.S. Supreme Court in American Textile Manufacturers Institute, Inc. v. Donovan, 101 S.Ct. 2478 (1981) ("ATMI"), the Commission held that "feasible" under the occupational noise standard means achievable.

The Commission overruled the cost-benefit test of feasibility previously set forth in Continental Can Co., 76 OSAHRC 109/A2, 4 BNA OSHC 1541, 1976-77 CCH OSHD P21,009 (No. 3973, 1976), appeal withdrawn, No. 76-3229 (9th Cir. Apr. 26, 1977), and substituted a test consistent with ATMI.

In view of this intervening change in law, the judge's decision with respect to the alleged violations of section 1910.95(b)(1) is vacated.

The case is remanded for further proceedings, including evidentiary submissions, so that the interrelated issues of technological and [*2]

economic feasibility can be reconsidered in light of the test of feasibility established by Sun Ship, Inc. n1

                                  • -Footnotes- - - - - - - - - - - - - - - - - -

n1 Chairman Rowland dissents.

He would not remand the case for further proceedings.

Consistent with his dissenting opinion in Sun Ship, he concludes that the requirement in section 1910.95(b)(1) that feasible administrative or engineering controls be utilized is invalid.

                                • -End Footnotes- - - - - - - - - - - - - - - - -

SO ORDERED

Does this precedent still control your case?

Ezel checks whether it still stands, including any court review since, and applies it to your situation with citations.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace