Could a water supplier with an existing interbasin transfer permit seek a new withdrawal permit early to avoid drought rules?

Short answer The AG said the supplier's existing interbasin transfer permit remained effective for its term and could not be bypassed by an early application under the new Act. It also said the supplier remained subject to the Drought Recovery Act and applicable drought response plans.
State
South Carolina
Opinion
2011-january-10-2011
Issued
January 10, 2011
Issued by
Office of the South Carolina Attorney General
Requested by
The Honorable Robert W. Hayes, Jr., Member, SC Senate

Apply this to your situation

This page answers the general question as of 2011. Ask about yours and see what current South Carolina law means for your facts, with citations you can check.

Disclaimer: This is an official South Carolina Attorney General opinion. AG opinions are persuasive authority but not binding precedent. This summary is for informational purposes only and is not legal advice. Consult a licensed South Carolina attorney for advice on your specific situation.
About this page: The plain-English summary, reader guidance, and Q&A below were written by Ezel based on the official AG opinion. The original opinion (linked on this page as a PDF) is the authoritative source for any reliance.
View original AG opinion (PDF)

Plain-English summary

In 2011, a South Carolina senator asked whether a public water supplier with an existing interbasin transfer permit or registration could move early into the new Surface Water Withdrawal Act's initial permit process. The Attorney General said the existing interbasin authorization remained effective for its term. The Act's description of existing interbasin holders as existing surface water withdrawers did not let them bypass their current permit conditions by seeking an initial permit before expiration.

The AG also said a public water supplier with an interbasin permit was still subject to the Drought Recovery Act and drought response plans required by the owner of a licensed impoundment. It read the Act's provisions together and rejected an interpretation that would exempt interbasin suppliers from measures applicable to other public suppliers.

Currency note

This opinion was issued in 2011. Subsequent statutory amendments, court decisions, or later
AG opinions may have changed the analysis. Treat this page as historical context, not current
legal advice. Verify current law before relying on any specific rule, deadline, or remedy
mentioned here.

Common questions

Could an existing interbasin permit holder apply early for the Act's initial withdrawal permit? A: The AG said the Act did not let a public water supplier abandon an existing interbasin permit before its expiration to obtain that initial permit.

Did calling interbasin holders “existing surface water withdrawers” change that result? A: No. The AG read that general description alongside the more specific provision keeping existing interbasin permits effective through their terms.

Were interbasin public suppliers exempt from drought response requirements? A: The AG said no. It concluded that the Drought Recovery Act and applicable impoundment-owner plans still applied to them.

Background and statutory framework

The 2010 Act established a surface water withdrawal permitting system and addressed existing interbasin transfer permits. The AG treated the current permit's continued effectiveness as the more specific rule and read it with the Act's separate public supplier drought provision. The opinion framed both answers as its interpretation of the law enacted in 2010.

Citations and references

The opinion discussed Sections 49-4-70, 49-4-150(A)(6), and 49-4-160(B) of the South Carolina Code and the South Carolina Drought Recovery Act.

Official title

Interpreting the recently enacted South Carolina Surface Water Withdrawal, Permitting, Use and Reporting Act of 2010 (Act No. 247 of 2010).

Requester

The Honorable Robert W. Hayes, Jr., Member, SC Senate

Source

Original opinion text

Best-effort transcription from a scanned PDF. Minor errors may remain — the linked PDF is authoritative.

Henry McMaster
ATTORNEY GENERAL

January 10, 2011

The Honorable Robert W. Hayes. Jr.
South Carolina Senate, District 15
205 Gressette Building

Columbia, South Carolina 2920)

Dear Senator Hayes:

You have asked for an interpretation of the recently enacted South Carolina Surface Water Withdrawal, Permitling. Use and Reporting Act of 2010 (Act No. 247 of 2010). Specifically. you ask two questions which are as follows:

(1) does the Surface Water Withdrawal Act exempt from the stalute’s surface water withdrawal permit (*SWW permit) renewal criteria those public water suppliers (PWS) currently operaling pursuant to an inter-basin (ransfer (IBT) permit or registration?

(2) does the Surface Water Withdrawal Act exempt a PWS currently operating pursuant to an [BT permit or registration from the South Carolina Drought Recovery Act (“Drought Recovery Act’), S.C. Code Ann. 49-23-10 to 100 and drought response plans required by the owner of a licensed impoundment?

You state that “[a]s a co-sponsor of this legislation, | assure you this was never the intent of the General Assembly.”

By way of background, you state the following:

[ijn the final days of the 2010 session, the General Assembly passed and Governor Sanford signed into law the Surface Water Withdrawal Act. The purpose of the legislation is to provide the State of South Carolina a process for regulating surface water withdrawals from rivers and streams throughout the State. Unregulated withdrawals may threaten public health

Remperr C. Dennis Burcpme « Posr Orrice Box 11549 - Corum, §.C. 29211-1549 - Te_epHone: 803-734-3970 « Facsmare: 803-253-6283 and the environment especially during times of drought. It is important the State's regulations properly reflect our legislative intent not to allow IBT permit and registration holders to prematurely apply for an initial SWW permit and thereby avoid the SWW Permit renewal and applicable drought plan water conservation criteria.

With respect lo your first question — are current IBT permit and registration (hereinafter collectively “IBT permit(s)”) holders exempt from the SWW renewal criteria — you note thal IBT systems are “deemed to be existing surface water withdrawers” pursuant to the Act and it is thus “this declaration that could create confusion.” You state that

{s]uch a designation could mistakenly allow “existing surface water withdrawers” who apply fora SWW Permit within one hundred eighty (180) days of the effective date of the regulations to argue that they should be “grandfathered” into the new SWW scheme both initially and upon each subsequent renewal (see, Act No. 247, Section 49-4-70(B)(1). Should this be allowed, an IBT permit or registration would bypass the SWW permit rencwal criteria for 30 years. This was not intended by the statute. The Surface Water Withdrawal Act is clear: Existing IBT permits and registrations remain effective until the IBT permits and registration expires. The new SWW Permit provisions do not create an opportunity for [BT's to prematurely void IBT permits or registrations for a more flexible SWW Permit.

With respect to your second question concerning the Drought Response Act, you likewise observe as follows:

Improper interpretation of the statute on this point may have far-reaching implications not intended by the General Assembly. I contend the statute tS More properly interpreted to create a subcategory of IBT’s, that being existing and future PWS which must comply with drought protocols addressed in Section 49-4-150 (A)(6).

Any interpretation of the Surface Water Withdrawal Act to exempt PWS IBT’s from the Drought Response Act or drought response plans managed by the owner of a licensed impoundment conflicts with the express provisions of the statue: “Nothing in this section limits or precludes any action authorized by Drought Response Act. In the event that an action authorized by the South Carolina Drought Response Act conflicts with this subsection or a permitted use, the action taken pursuant to the South Carolina Drought Response Act supersedes any actions taken pursuant to this subsection or the permit.” S 452 Section 49-4-160(B) .... Moreover, such an erroneous interpretation would result ina PWS, that is not an IBT system, being required to comply with such drought measures, while exempting a PWS that is an IBT system meeting those same standards, There was no legislative intent to treat [BT and non-IBT PWS differently.

Thus, you ask our assistance “in advising DILEC that IBT systems holding current water withdrawal permits or registrations musi conlinue to operate under those authorizations until their expiration, and are not authorized by the statute to prematurely apply for an initial SWW Permit because they are already a permiffed surface waler withdrawer. Likewise, DIJEC should be advised that existing and future PWS must comply with the required drought protocols addressed in Section 49-4-150(A)(6), even if a PWS is also an IBT system.” (emphasis in original).

Law / Analvsis

Section 49-4-80 of the Surface Water Withdrawal Act sets forth in great detail the information which an applicant for a surface water withdrawal permit must include. In addition subsection (B) sets forth the criteria to determine whether an applicant's “use 1s reasonable.” Among these criteria are (1) the minimum instream flow or minimum water level and the safe yield for the surface water source at the location of the proposed surface water withdrawal as well as (2) “the anticipated effect of the applicant’s proposed use On existing users of the same surface water source including, but not limited to, present agricultural, municipal, industrial, clectrical generation and instream users ...."” In addition, DHEC must apply criteria such as

(3) the reasonably foreseeable future need for the surface water ...
[and]

(4) whether it is reasonably foreseeable that the applicant's proposed withdrawals would result in a significant, detrimental impact on navigation, fish and wildlife habitat, or recreation ... .

Numerous other criteria are specified therein. Further, § 49-4-80 lists certain duties which DHEC must carry out in reaching its decision on a pending application. See § 49- 4-80(C) through (L). DHEC must determine ultimately whether a “new surface water withdrawal permit application or an application to significantly increase the amount of water that may be withdrawn...” may be permitted. See § 49-4-80(L). It will, in short, be DHEC's task to determine the “safe yield of the surface water source and the volume of the supplemental water supply, if needed, necessary to sustain the applicant's water use.” § 49-4-80(C). With respect to drought response measures for public water suppliers, as you note, “[a]s established by the State Drought Response Committee, each service territory of a PWS is governed by certain low-flow protocols during drought conditions. Specifically,
§ 49-4-150(6) provides as follows:

|t]he requirements of items (1) through (4) do not apply to public water
suppliers. Public water suppliers are required to implement their contingency plan measures, applicable to their service territory, conimensurate with the drought level declared by the State Drought Response Committee and in accordance with any drought response plan required by the owner of a licensed impoundment.

Moreover, the primacy of the Drought Response Act is emphasized by § 49-4-160(B) which further provides:

[nJothing in this section limits or precludes any action authorized by the South Carolina Drought Response Act. In the event that an action authorized by the South Carolina Drought Response Act conflicts with this subsection or a permitted use, the action taken pursuant to the South Carolina Drought Response Act supersedes any actions taken pursuant to this subsection or permit.

The confusion of which you speak in your letter has apparently been created by § 49-4-70. This Section provides a “grandfathering” for “existing surface water withdrawers.” “Existing surface water withdrawers” are given a permit at least “for thirty years for a permittee entitled to an initial permit pursuant to § 49-4-70(B) ....” § 49-4- 100B(2). An “existing surface water withdrawer” is defined by § 49-4-20(9) as follows:

‘Existing surface water withdrawer’ means a surface water withdrawer withdrawing surface water as of the effective date of this chapter or a proposed surface water withdrawer with its intakes under construction before the effective date of this chapter or with all necessary applications for its intake permits deemed administratively complete before January first of the year of the effective date of this act.

Subsection (B)(1) of § 49-4-70 provides in pertinent part that:

|a]n existing surface water withdrawer must apply for a permit pursuant to
this chapter within one hundred eighty days of the effective date of regulations promulgated by the department pursuant to his chapter. An existing surface water withdrawer that applies for a permit must be issued an initial permit but the initial permit and subsequent renewals are not subject to the permitting criteria in Section 49-4-80 and are not subject to Section 49-4-] 50. Subsection (C} of § 49-4-70 deals with interbasin transters or IBT’s. Such provision Hates as follows:

[ijie expiration date of an interbasin transfer permit or an interbasin registration, including any water withdrawal right or authority contained in the permit or registration, in ¢xistence on the effective date of this chapter remains effective. For the purposes of this chapter, existing interbasin transfer permit{s] or mterbasin registration holders are deemed to be existing surface water withdrawers. A renewal of an interbasin transfer penmil or registration must be made pursuant to the criteria established in this chapter for existing surface water withdrawers, except that permits or revistration renewed within three years after the eflective date of this chapter must be renewed for a quantity at least equal to the permitted quantity in the expired permit, All olher renewals must be issued in accordance with the criterion applicable to existing surface water withdrawers and lor a quantity equal to the permitted quantity in the expired permit unless the department demonstrates by a preponderance of the evidence that the quantity above maximum withdrawals during the permit term are not necessary to meet the permittee ’s future need.

It is the sentence contained in subsection (C)—“(f)or the purposes of this chapter, existing interbasin transfer permit[s| or interbasin registration holders are deemed to be existing surface walter withdrawers ...” which is causing confusion. Accordingly, we must resort to the rules of statutory construction. As our Supreme Court explained in SCANA Corp, v South Carafing Dept of Revenue, 384 5.0. 388, 992, 683 5.E.2d 468, 470 (2009),

[t]he cardinal cule of statutory cons.ruction is to ascertain and effectuate the intent of the Legislature. Mrdees vo Rainey, J41 $C, 79, 85, $33 S.E.2d 578, 58) (2000)," All rules of statutory construction are subservient to the one that the legislative intent must prevail if it can be reasonably discovered in the language used, and that language must be construed in light of the intended purpose of the statute.” [rowahurst v- City of Myrile Beach Election Comm'n, 342 $.C, 374, 380,597 §.E.2d
$43, 346 (2000). The Court should give the words their plain and ordinary meaning, without resort to subtle or forced construction to limit or expand the statute’s operation. Sloan v &.C. Bal af Physical Therapy Exam 'rs, 370 8.C. 452, 469, 636 S.E.2d 598, 607 (2006).

In addition, itis well recownized [hat “[a] salute should not be construed hy concentrating on any isolated phrase.” Instead, [i]n construing statutory language, the stalute must be read as a whole and sections which are a part of the same general statutory law must be construed together and each one given effect.” South Coraline State Ports Autharity vy. Jasper County. 368 $.C. 388, 398. 629 8.E.2d 624, 629 (2006), As our Supreme Court long age wrote: “Tf any part of a statute be obscure, it is proper to consider the other parts; the words and meaning of one part of a statute frequently lead to the sense of another.’ Davenport v. Caldwell, 10 S.C. (Rich.) 317 (1878), quoting 9 Bac. Abr. Stat. 239.

Moreover, it is well settled that where statutory provisions are in conflict with one another, “[r]epea) by implication is disfavored and is found only when [the] two statutes are incapable of any reasonable reconcilement.” Capco of Summerville v. J. H. Gayle Const. Co.. Inc., 368 S.C. 137, 141, 628 S.E.2d 38, 41 (2006). As a means of such reconcilement, the Supreme Court has consistently recognized that

[where there is one statute addressing an issue in general terms and another stalute dealing with the identical issue in a more specific and definile manner, the more specific statute will be considered an exception lo, or a qualifier of, the general statute and given such effect. Wilder v. South Carolina Hwy. Dept., 228 S.C. 448, 90 S.E.2d 635 (1955). See also Wooten ex rel. Woolen v. S.C. Dept. of Transp., 333 S.C. 464, 468. 511 S.E.2d 355, 357 (1999) (a specific statutory provision prevails over a more general one); Atlas Food Sys. And Serys. vy. Crane Nat'l Vendors Div. of Unidynamics Corp., 319 S.C. 556, 558, 462 $.E.2d 858, 859 (1995) (general rule of statutory construction is that a Specific statute prevails over a more general one).

Capco, 368 S.C. 137.

In addition, as a remedial statute, the Surface Water Withdrawal Act would be entitled to a liberal construction in order to effectuate the legislative purpose. In an opinion, dated March 17, 2010, we stated the rule of construction as follows:

... if a statute ts remedial in nature, it must be liberally construed to carry out the purpose mandated by the General Assembly. As noted at 3 Sutherland Statutory Construction § 60:1 (6"" ed.),

[a] liberal construction is ordinarily one which makes the stalutory rule or principle apply to more things or in more situations than would be the case under a Strict construction
.. When there is an ambiguity in a remedial statute, it should be construed to meet the cases which are clearly within the spint or reason of the law, or within the evil which tt was designed to remedy, providing the inlerpretation 1s not inconsistent with the language used, resolving all reasonable doubts in favor of applicability of the statute to a particular case ... Courts also presume the ambiguous language in a remedial statute is entitled to a generous construction consistent with its reformative mission. Qur Supreme Court has applied the foregoing rule of construction in a variety of circumstances. Sve. Quelity Towing, dec. v. City af Myprile Beach, 345 S.C. 156, 161,547
§.E.2d $62, 864-865 (2001) (FOIA) SC. Dem. of Mente! Health yo Harnaa, 270 S.C, 210, 241 §.E.2d 563 (1978) [mandating the commitment of a mentally ill person): Hartsville Catton Milly, SoC. Employment Security Comm. 224.8.C. 407, 79 38.6. 2d 381 (1953) [economic security duc lo unemployment],

Based upon the forepoing rules of construction, it is our opinion that the Surface Water Withdrawal Act docs nol contemplate a PWS, which is the holder of an [BT permit or registration, to crmploy the procedure in § 49-4-70/B)(1) by applying for an initial permit within one hundred eighty days of the regulations promulgated by DHEC, Itis true that Subsection (C} of § 49-4-70 provides that “(for the purposes of this chapter, existing interbasin transfer permit or interbasin régistration holders are deemed to be existing surface water withdrawers.” However, fora number of reasons, we do not deem this provision controlling with respect to. any PWS currently operating pursuant to an interbasin transter permut or repistration such that it may abandon its existing [BT permit and assume the role of an existing surlace water withdrawal for purposes of § 49-4- 7 B)(1). The first sentence of Subsection (C) of } 49-4-70, which we believe is the more specitic provision, expressly provides that “[t/he expiration date of an interbasin transter permit or an interbasin registration, including any water withdrawal right or authority contained in the permit or registration, in existence on the effective date of this chapter, remains effective. (emphasis added). Such provision would, in our view. prevail over the nore general provision deeming IAT permit holders to be “existing surface water withdrawers” for the general purpose of the “chapter” relating to surlace water withdrawal. As we understand it, the Surface Water Withdrawal Act repealed the previously existing IBT licensure law. See Section 4 of the Surface Water Withdrawal Act repealing Chapter 21 of Tithe 49 of the Code (entitled Interbasin Transfer of Water), In light of such repeal, making [BT permitting now subject to the Surface Water Act, the Legislature was thus cognizant that existing [BT permits must be honored and thus declared that such “existing permits” were deemed to be “existing surface water withdrawers” lor the purposes of the Surface Water Withdrawal Act. Such does not mean. however, that the more specific provision, mandating that the IBT permit “remains effective,” may be ignored in favor of the general language referred to above, deeming an IB) permit holder to be an “existing surface water withdrawer™ so that the [BT holder gould then apply for the intial permit pursuant to $ 49-4-70(B)(1), In our opinion, the prevailing cules of statutory construction dictate otherwise. We do not think the General Assembly intended that Public Water Systems who are existing [BT permit holders may prematurely end the terms of their existing IBT permit in this way.

Moreover, in our view, ifthe General Assembly had indeed intended that a PWS which held an existing IBT permit could bypass the express requirement that such permit “remains elfective™ the remaining language in Subsection (C) would have been completely unnecessary. Such a reading would fly in the face of the well recugnized rule of construction, referenced above, which states that “in construing Statutory language, the statute must be read asa whole and sections of the same general statutory law must be construed together and each one given effect.” South Carolina State Ports Authority v. Jasper County, supra.

Likewise, in our opinion, allowing a PWS holding an existing IBT permit to be released from that permit prematurely would allow the PWS to avoid the drought restrictions under the Drought Response Act. Section 49-4-150(A)(6) expressly provides that “[p]ublic water suppliers are required to implement their contingency plan measures, applicable to their service territory, commensurate with the drought level declared by the State Drought Response Committee and in accordance with any drought response plan required by the owner of a ticensed impoundment.” For the same reasons as discussed above, we believe the Legislature did not intend a PWS to circumvent these requirements. Again, there is a logical explanation for the Legislature’s use of the language contained in § 49-4-70(C) deeming IBT permit holders to be “existing surface water withdrawers.” Moreover, neither this language nor the general language of Subsection (B)(1) of § 49-4-70 may be deemed to override the more specific provision of
§ 49-4-150(A)(6).

Lastly, we deem the Surface Water Withdrawal Act to be remedial in nature and, therefore, entitled to a liberal construction. Accordingly, all doubts must be resolved in favor of the Legislature’s purpose which is, as you note, “to provide the State of South Carolina a process for regulating surface water withdrawals from rivers and streams throughout the State.” As you correctly point out, “[u]nregulated withdrawals may threaten public health and the environment especially during times of drought.” In our view, interpretation of the Act to the end that a PWS holding an IBT permit could abandon the terms and conditions of such permit, and proceed to seek an initial permit as an “existing surface water withdrawer” under § 49-4-70(B)(1), would be inconsistent with the Surface Water Withdrawal Act’s remedial purpose. Accordingly, we do not believe a court would so interpret the Act.

Conclusion

In answer to your first question, it is our opinion that the Surface Water Withdrawal] Act does not authorize public water suppliers who are currently operating pursuant to an interbasin transfer BT) permit or registration, to bypass the terms and conditions of their current IBT permit in order to prematurely apply for an initial permit as an existing surface water withdrawer. Applying the rules of statutory construction, we believe the Surface Water Act requires that the IBT permit remains effective for the hfe of the permit. In short, the Act would likely not be interpreted by a court to permit the PWS, as an IBT permittee, to prematurely seek the permit authorized by § 49-4-70(B)(1) for existing surface water withdrawers, a permit ultimately issued for at least thirty years. Instead, a court would employ the well recognized principles of statutory construction to reach the conclusion that both public and private IBT withdrawers remain subject to the existing IBT permit for the life of that permit. For the same reasons, rt 1s our opinion that the Act does not authorize a PWS currently operating pursuant to an [BT permit or registration to be exempt from the Drought Recovery Act and drought response plans required by the owner of a licensed impoundment. As you indicate, to interpret the Surface Water Act in this manner would result ina PWS which is not an [BT permittee being required to comply with these drought measures, while exempting a PWS that is an [BT system from any such requirements. Such an interpretation would render meaningless § 49-4-150(A)(6) and, in our opinion, the General Assembly did not intend such an interpretation,

Very truly yours,

Henry McMaster
Attorney General

[bb t & Ora,

By: Robert D. Cook
Deputy Attorney General

ROC/an

What does South Carolina law say today, for your facts?

This opinion is from 2011. Ezel checks the current South Carolina statutes and case law, applies them to your situation, and cites what it relies on.

Opens in Ezel Pro.

  • Checks the law as it stands today, not only this page
  • Cites every source it relies on, so you can verify it
  • Chat, drafting and research in one workspace