INTERCONNECTION AGREEMENT
Agreement Number: [________________________________]
Queue Position (if applicable): [________________________________]
Effective Date: [__/__/____]
PARTIES
INTERCONNECTION CUSTOMER (Generator):
Name: [________________________________]
Address: [________________________________]
City, State, ZIP: [________________________________]
Phone: [________________________________]
Email: [________________________________]
INTERCONNECTING UTILITY (Transmission/Distribution Provider):
Company Name: [________________________________]
Address: [________________________________]
City, State, ZIP: [________________________________]
Phone: [________________________________]
Email: [________________________________]
TRANSMISSION PROVIDER (if different):
Name: [________________________________]
Address: [________________________________]
RECITALS
WHEREAS, Interconnection Customer owns or operates a generating facility that it seeks to interconnect with the Interconnecting Utility's system;
WHEREAS, Interconnecting Utility operates an electric transmission and/or distribution system;
WHEREAS, the parties have completed the required interconnection studies and procedures;
NOW, THEREFORE, in consideration of the mutual covenants contained herein, the parties agree as follows:
ARTICLE 1: DEFINITIONS
1.1 "Commercial Operation Date" means the date on which the Generating Facility first produces energy for delivery to the Grid.
1.2 "Generating Facility" means the equipment used to produce electric energy, as described in Exhibit A.
1.3 "In-Service Date" means the date on which the Interconnection Facilities are complete and ready for operation.
1.4 "Interconnection Customer" means the party identified above that owns or operates the Generating Facility.
1.5 "Interconnection Facilities" means the facilities required to interconnect the Generating Facility to the Grid, as described in Exhibit B.
1.6 "Interconnection Request" means the request submitted by Interconnection Customer to interconnect the Generating Facility.
1.7 "Network Upgrades" means modifications to the Utility's system required to accommodate the Generating Facility.
1.8 "Point of Interconnection" or "POI" means the physical location where the Generating Facility connects to the Grid.
1.9 "System Impact Study" means the engineering study evaluating the impact of the Generating Facility on the Grid.
ARTICLE 2: GENERATING FACILITY INFORMATION
2.1 Facility Description
| Parameter | Specification |
|---|---|
| Facility Name | [________________________________] |
| Technology Type | ☐ Solar PV ☐ Wind ☐ Natural Gas ☐ Battery Storage ☐ Hydro ☐ Other: [________] |
| Nameplate Capacity | [________] MW AC |
| Maximum Facility Output | [________] MW |
| Minimum Operating Level | [________] MW |
| Reactive Power Capability | [________] MVAR |
| Number of Generating Units | [________] |
2.2 Facility Location
Physical Address: [________________________________]
Latitude: [________________________________]
Longitude: [________________________________]
County: [________________________________]
State: [________________________________]
2.3 Interconnection Type
☐ Energy Resource Interconnection Service (ERIS)
☐ Network Resource Interconnection Service (NRIS)
☐ Small Generator Interconnection (< 20 MW)
☐ Fast Track Interconnection (< [____] MW)
☐ Net Metering Interconnection
2.4 Voltage Level
☐ Transmission Level: [________] kV
☐ Distribution Level: [________] kV
☐ Secondary Level: [________] V
ARTICLE 3: INTERCONNECTION FACILITIES
3.1 Interconnection Customer's Facilities
Interconnection Customer shall design, construct, own, operate, and maintain the following facilities:
☐ Generation equipment
☐ Step-up transformer(s): [________] MVA, [________]/[________] kV
☐ Collector system
☐ Metering equipment
☐ Protective relays and equipment
☐ SCADA/Communications equipment
☐ Interconnection line to POI: [________] feet/miles of [________] kV line
☐ Other: [________________________________]
3.2 Utility's Interconnection Facilities
Utility shall design, construct, own, operate, and maintain the following facilities:
☐ Metering equipment
☐ Disconnect switches
☐ Protective relays
☐ Breaker(s)
☐ Communications equipment
☐ Other: [________________________________]
3.3 Network Upgrades
The following Network Upgrades are required:
| Upgrade Description | Estimated Cost | Responsibility |
|---|---|---|
| [________________________________] | $[________] | [________] |
| [________________________________] | $[________] | [________] |
| [________________________________] | $[________] | [________] |
Total Estimated Network Upgrade Cost: $[________________________________]
ARTICLE 4: POINT OF INTERCONNECTION
4.1 Location
The Point of Interconnection shall be located at:
[________________________________]
[________________________________]
4.2 Voltage
Nominal voltage at POI: [________] kV
4.3 Configuration
☐ Single radial line
☐ Loop configuration
☐ Network configuration
☐ Other: [________________________________]
4.4 Ownership Demarcation
The point of ownership demarcation shall be: [________________________________]
ARTICLE 5: COSTS AND PAYMENTS
5.1 Study Costs
| Study | Cost | Paid |
|---|---|---|
| Feasibility Study | $[________] | ☐ Yes ☐ No |
| System Impact Study | $[________] | ☐ Yes ☐ No |
| Facilities Study | $[________] | ☐ Yes ☐ No |
5.2 Interconnection Facility Costs
| Cost Category | Estimated Cost | Actual Cost |
|---|---|---|
| Interconnection Customer's Facilities | $[________] | $[________] |
| Utility's Interconnection Facilities | $[________] | $[________] |
| Network Upgrades | $[________] | $[________] |
| Total | $[________] | $[________] |
5.3 Payment Terms
☐ Interconnection Customer shall pay 100% of costs prior to construction.
☐ Interconnection Customer shall pay [________]% deposit, balance upon completion.
☐ Costs to be paid in installments: [________________________________]
5.4 Cost Responsibility
☐ Interconnection Customer responsible for all Interconnection Facility costs.
☐ Interconnection Customer responsible for all Network Upgrade costs.
☐ Network Upgrade costs subject to reimbursement per [________________________________].
5.5 True-Up
Final costs shall be reconciled within [________] days of completion, with refund or additional payment as applicable.
ARTICLE 6: MILESTONES AND SCHEDULE
6.1 Critical Milestones
| Milestone | Target Date | Actual Date |
|---|---|---|
| Execution of this Agreement | [__/__/____] | [__/__/____] |
| Initial Payment Received | [__/__/____] | [__/__/____] |
| Engineering Design Complete | [__/__/____] | [__/__/____] |
| Permits Obtained | [__/__/____] | [__/__/____] |
| Equipment Procurement | [__/__/____] | [__/__/____] |
| Construction Start | [__/__/____] | [__/__/____] |
| Construction Complete | [__/__/____] | [__/__/____] |
| Testing Complete | [__/__/____] | [__/__/____] |
| In-Service Date | [__/__/____] | [__/__/____] |
| Commercial Operation Date | [__/__/____] | [__/__/____] |
6.2 Extensions
Extensions may be granted for:
☐ Force Majeure events
☐ Delays caused by Utility
☐ Permitting delays beyond Interconnection Customer's control
☐ Other: [________________________________]
6.3 Delay Consequences
Failure to meet milestones may result in:
☐ Loss of queue position
☐ Termination of this Agreement
☐ Forfeiture of deposits
☐ Other: [________________________________]
ARTICLE 7: TESTING AND COMMISSIONING
7.1 Pre-Parallel Testing
Prior to initial parallel operation, the following tests shall be completed:
☐ Protective relay testing
☐ Metering verification
☐ Communication system testing
☐ Control system testing
☐ Generator performance testing
7.2 Parallel Operation Testing
☐ Synchronization testing
☐ Real and reactive power control
☐ Voltage regulation
☐ Frequency response
☐ Fault response
7.3 Witness Testing
☐ Utility shall have the right to witness all tests.
☐ [________] days advance notice of testing required.
7.4 Test Results
Interconnection Customer shall provide test results to Utility within [________] days of testing.
ARTICLE 8: TECHNICAL REQUIREMENTS
8.1 Applicable Standards
The Generating Facility shall comply with:
☐ IEEE 1547 (Standard for Interconnection)
☐ IEEE 1547.1 (Testing Requirements)
☐ UL 1741 (Inverter Safety Standard)
☐ NERC Reliability Standards
☐ RTO/ISO requirements: [________________________________]
☐ Utility's interconnection requirements
☐ National Electrical Code (NEC)
8.2 Power Quality
| Parameter | Requirement |
|---|---|
| Voltage Regulation | ±[____]% of nominal |
| Frequency Range | [____] Hz to [____] Hz |
| Power Factor | [____] lagging to [____] leading |
| Harmonic Distortion (THD) | < [____]% |
| Flicker | Per IEEE 1547 |
8.3 Protective Requirements
The Generating Facility shall include the following protective functions:
☐ Over/Under Voltage Protection (27/59)
☐ Over/Under Frequency Protection (81O/81U)
☐ Reverse Power Protection (32)
☐ Ground Fault Protection (50G/51G)
☐ Phase Fault Protection (50/51)
☐ Synchronization Check (25)
☐ Anti-Islanding Protection
☐ Other: [________________________________]
8.4 Disconnection Requirements
The Generating Facility shall automatically disconnect for:
| Condition | Setting | Trip Time |
|---|---|---|
| Overvoltage (V > [____]%) | [____] V | [____] seconds |
| Undervoltage (V < [____]%) | [____] V | [____] seconds |
| Overfrequency | [____] Hz | [____] seconds |
| Underfrequency | [____] Hz | [____] seconds |
8.5 Reactive Power Requirements
☐ Facility shall be capable of operating at power factor of [____] lagging to [____] leading.
☐ Facility shall provide voltage support per [________________________________].
ARTICLE 9: METERING
9.1 Revenue Metering
☐ Utility shall install and own revenue meters.
☐ Interconnection Customer shall install and own revenue meters.
☐ Meters shall meet ANSI C12 standards.
9.2 Meter Location
Revenue meters shall be located at: [________________________________]
9.3 Metering Configuration
☐ Bi-directional metering
☐ Separate meters for generation and consumption
☐ Net metering
☐ Other: [________________________________]
9.4 Meter Data
☐ Meter data shall be transmitted to: [________________________________]
☐ Meter data intervals: [________] minutes
☐ Data access provided to: ☐ Interconnection Customer ☐ RTO/ISO ☐ Other
9.5 Meter Testing
Meters shall be tested:
☐ Before initial operation
☐ Annually
☐ Upon request by either party
ARTICLE 10: OPERATIONS
10.1 Operating Requirements
Interconnection Customer shall:
☐ Operate in compliance with Good Utility Practice
☐ Maintain 24/7 contact capability
☐ Coordinate with Utility's system operations
☐ Comply with dispatch instructions (if applicable)
☐ Participate in required market operations
10.2 Curtailment
☐ Utility may curtail output for:
☐ System reliability
☐ System emergencies
☐ Transmission constraints
☐ Maintenance
☐ [________] minutes advance notice required (except emergencies)
☐ Compensation for curtailment: [________________________________]
10.3 Outage Coordination
☐ [________] days advance notice required for scheduled outages.
☐ Parties shall coordinate maintenance schedules.
☐ Emergency outage notification as soon as practicable.
10.4 SCADA/Telemetry
☐ Real-time data transmission required.
☐ Data points to be provided: [________________________________]
☐ Communication protocol: [________________________________]
ARTICLE 11: TERM AND TERMINATION
11.1 Term
This Agreement shall become effective on the Effective Date and continue for [________] years, unless earlier terminated.
11.2 Renewal
☐ Agreement shall automatically renew for successive [________] year terms unless terminated.
☐ Renewal requires written agreement.
11.3 Termination
This Agreement may be terminated:
☐ By either party upon [________] months written notice
☐ By Utility upon default by Interconnection Customer
☐ By Interconnection Customer upon permanent retirement of Generating Facility
☐ Upon failure to achieve Commercial Operation by [__/__/____]
11.4 Effect of Termination
Upon termination:
☐ Interconnection Customer shall disconnect and remove facilities
☐ Security deposits shall be returned (less amounts owed)
☐ Surviving obligations: [________________________________]
ARTICLE 12: SECURITY
12.1 Security Requirement
Interconnection Customer shall provide security in the amount of:
☐ $[________] (fixed amount)
☐ $[________] per MW of capacity
☐ [________]% of estimated Network Upgrade costs
12.2 Form of Security
☐ Cash deposit
☐ Letter of credit
☐ Surety bond
☐ Parent company guarantee
12.3 Security Reduction
Security may be reduced upon:
☐ Achievement of Commercial Operation
☐ Completion of Network Upgrades
☐ Other: [________________________________]
ARTICLE 13: LIABILITY AND INDEMNIFICATION
13.1 Limitation of Liability
NEITHER PARTY SHALL BE LIABLE FOR CONSEQUENTIAL, INCIDENTAL, PUNITIVE, OR INDIRECT DAMAGES.
13.2 Interconnection Customer's Indemnification
Interconnection Customer shall indemnify Utility for claims arising from:
☐ Operation of the Generating Facility
☐ Interconnection Customer's negligence
☐ Breach of this Agreement
13.3 Utility's Indemnification
Utility shall indemnify Interconnection Customer for claims arising from:
☐ Utility's negligence
☐ Breach of this Agreement
ARTICLE 14: INSURANCE
14.1 Required Insurance
Interconnection Customer shall maintain:
| Type | Minimum Coverage |
|---|---|
| Commercial General Liability | $[________] per occurrence |
| Property Insurance | Full replacement cost |
| Workers' Compensation | Statutory limits |
14.2 Additional Insured
Utility shall be named as additional insured.
14.3 Proof of Insurance
Certificates of insurance shall be provided:
☐ Upon execution
☐ Annually
☐ Upon request
ARTICLE 15: DISPUTE RESOLUTION
15.1 Informal Resolution
Parties shall attempt good faith resolution for [________] days.
15.2 Formal Resolution
☐ FERC dispute resolution procedures
☐ State commission dispute resolution procedures
☐ Arbitration under [________________________________]
☐ Litigation in courts of [________________________________]
15.3 Governing Law
This Agreement shall be governed by the laws of [________________________________].
ARTICLE 16: MISCELLANEOUS
16.1 Assignment
☐ Assignment requires prior written consent.
☐ Assignment to lenders permitted without consent.
16.2 Amendments
Amendments must be in writing signed by both parties.
16.3 Notices
All notices to addresses above or as updated in writing.
16.4 Entire Agreement
This Agreement constitutes the entire agreement.
16.5 Counterparts
May be executed in counterparts.
EXHIBITS
☐ Exhibit A: Generating Facility Description
☐ Exhibit B: Interconnection Facilities
☐ Exhibit C: One-Line Diagram
☐ Exhibit D: Milestone Schedule
☐ Exhibit E: Technical Specifications
☐ Exhibit F: Metering Diagram
☐ Exhibit G: Insurance Requirements
SIGNATURES
INTERCONNECTION CUSTOMER:
Signature: [________________________________]
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]
INTERCONNECTING UTILITY:
Signature: [________________________________]
Printed Name: [________________________________]
Title: [________________________________]
Date: [__/__/____]
This Interconnection Agreement template is provided for informational purposes only. Interconnection requirements vary significantly by utility, RTO/ISO, and jurisdiction. Consult with qualified legal and engineering professionals before execution.
Do more with Ezel
This free template is just the beginning. See how Ezel helps legal teams draft, research, and collaborate faster.
AI that drafts while you watch
Tell the AI what you need and watch your document transform in real-time. No more copy-pasting between tools or manually formatting changes.
- Natural language commands: "Add a force majeure clause"
- Context-aware suggestions based on document type
- Real-time streaming shows edits as they happen
- Milestone tracking and version comparison
Research and draft in one conversation
Ask questions, attach documents, and get answers grounded in case law. Link chats to matters so the AI remembers your context.
- Pull statutes, case law, and secondary sources
- Attach and analyze contracts mid-conversation
- Link chats to matters for automatic context
- Your data never trains AI models
Search like you think
Describe your legal question in plain English. Filter by jurisdiction, date, and court level. Read full opinions without leaving Ezel.
- All 50 states plus federal courts
- Natural language queries - no boolean syntax
- Citation analysis and network exploration
- Copy quotes with automatic citation generation